Mine Water Treatment Scheme (MWTS) - Panel Relocation

Descriptions

The Mining Remediation Authority have two Mine Water Treatment Scheme (MWTS) sites with solar PV installed that have missing or damaged solar panels. The sites are Dawdon MWTS and Bates MWTS. Both of these sites share the same 270w solar panels, in terms of manufacturer and model number.

We would like to relocate missing panels from Dawdon MWTS with panels located at Bates MWTS.

Sourcing rationale

A total of four quotes were requested and three were received from local SMEs. A comparison matrix was compiled, assessing cost, capacity, and overall suitability to determine the best fit supplier. This approach was selected over a full tender process as the contract value falls below the relevant threshold, allowing a more proportionate and efficient procedure

Timeline

Published Date :

21st Aug 2025 23 days ago

Deadline :

N/A

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

CPV Codes

Keywords

solar installation

PV system installation

solar panel setup

renewable installation

electrical installation

building wiring

electrical systems fitting

internal power grid

circuit installation

electrical infrastructure

lighting and power setup

cable routing

electrical connection works

electrical network installation

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors