Awarded
Mine Water Treatment Scheme (MWTS) - Panel Relocation
Descriptions
The Mining Remediation Authority have two Mine Water Treatment Scheme (MWTS) sites with solar PV installed that have missing or damaged solar panels. The sites are Dawdon MWTS and Bates MWTS. Both of these sites share the same 270w solar panels, in terms of manufacturer and model number.
We would like to relocate missing panels from Dawdon MWTS with panels located at Bates MWTS.
Sourcing rationale
A total of four quotes were requested and three were received from local SMEs. A comparison matrix was compiled, assessing cost, capacity, and overall suitability to determine the best fit supplier. This approach was selected over a full tender process as the contract value falls below the relevant threshold, allowing a more proportionate and efficient procedure
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
9332000 - Solar installation
45310000 - Electrical installation work
Keywords
solar installation
PV system installation
solar panel setup
renewable installation
electrical installation
building wiring
electrical systems fitting
internal power grid
circuit installation
electrical infrastructure
lighting and power setup
cable routing
electrical connection works
electrical network installation
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors