Closed

Minor Works Framework to facilitate successful delivery of the North London Heat and Power Project (Edmonton, London) - civil engineering and associated supplies and services

Descriptions

The Authority is in the preparatory stage of a procurement framework with a maximum of three contractors for minor works in relation to the NLHPP. The NLHPP is a programme of works to be carried out for the Authority at its 'EcoPark' site, in Edmonton, London N18 AG. The works involve the construction and commissioning of enhancements to the civil infrastructure in and around the EcoPark, and may include but not be limited to: , (i)intrusive site investigations to verify the location of services and underground obstructions;, (ii)non-intrusive surveys / investigations to the PAS 128 guidance to verify the location of services and underground obstructions;, (iii)alterations and enhancements to roads and pedestrian accesses to enable the EcoPark to function whilst the new NLHPP facilities are constructed and brought into service. These may span watercourses;, (iv)alterations and enhancements to EcoPark security infrastructure to enable NLHPP construction areas to operate within the EcoPark's overall security system;, (v)temporary and permanent alterations to the EcoPark water and drainage systems to enable the construction of NLHPP facilities;, (vi)diversion of utilities to enable NLHPP delivery; , (vii) landscaping reinstatement of soft verges and footpaths around the EcoPark;, (viii)supply and install temporary buildings; and, (ix)removal of any temporary structure erected during the NLHPP works., The works are required to enable the efficient and effective delivery of the NLHPP for the development of a replacement energy recovery facility and associated works at the EcoPark pursuant to a development consent order granted to the Authority on 24.2.2017. Design may typically be carried out by the Authority's technical advisor to enable the contractor to carry out construction. The contractor may be required to design certain elements. , The site for the works, Edmonton EcoPark, is an operational waste management site where LondonEnergy Ltd, a private company wholly owned by the Authority, operates an existing Energy from Waste (EfW) facility. Normal operation of the EfW facility is to be maintained at all times during the works., Contracts will be called off under the framework by way of direct award through a cab rank system (also known as a direct award via rotation) for projects that are under £50,000 and by way of a mini-competition procedure for projects above this threshold. Projects are expected to range from £10,000 to £610,000, however there may be projects available outside this range.

Timeline

Published Date :

17th Feb 2022 3 years ago

Deadline :

7th Mar 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

masonry

general building

facility design

public works

new buildings

building sites

structural work

renovation work

technical design

surveying

superstructure

residential construction

site construction

architectural building

infrastructure projects

construction work

structural construction

structural engineering

shell construction

construction services

civil engineering

construction consultancy

planning consultancy

building construction

building erection

architectural services

inspection services

building engineering

commercial building works

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Framework

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk