Closed

Minsmere RSPB: Access for all footpath & new bridge

Descriptions

The aim of the project is to improve access to the Minsmere East Hide for visitors with impaired mobility. A fully accessible path will be constructed to connect the North Wall trail to the extended East Hide inside the existing sea defence. The path will create an aesthetically pleasing access route with carefully spaced bench seating with views over the adjacent Scrape. A ramp will be constructed to provide access from the North Wall, ensuring that the North Wall's function as a flood defence is unimpaired. A low-level path or boardwalk will then follow the line of the sea defence to the East Hide. This will involve creating a new bridge over the Scotts Hall Drain and meeting the apron of the hide so that wheelchair access is maintained. The ramp from the North Wall will be created with granite-filled gabions and a surfaced path. The path from the base of the ramp has been specified similarly, but we would be keen to consider a boardwalk solution, preferably using recycled plastic boards for the decking and structure. Details of how to apply in Tender document attached

Timeline

Published Date :

22nd Mar 2022 in a 2 years

Deadline :

11th Apr 2022 in a 2 years

Contract Start :

1st Sep 2022

Contract End :

3rd Apr 2023

Tender Regions

UK

CPV Codes

45000000 - Construction work

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors