Open Closing in a 9 days
Muck Away Haulage
Descriptions
The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North.
Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety.
The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions.
The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and
around the junction for both pedestrians and cyclists.
Other construction works include but not limited to
the following:
-2no. underpasses for the M3 mainline and A34 Northbound
-1no. pedestrian subway
-9no. MS4s, 1no. long span and 1no. portal gantries
-Footbridge over the River Itchen
-6no. locations for sheet piling locations and 1no. for blockwork retaining wall
-Site wide motorway communications installation
-Site wide vehicle restraint barrier installation
The scope of the works required is for the removal of arisings from the site including concrete, asphalt and inert materials.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Keywords
construction work
building construction
civil engineering
infrastructure projects
site construction
building sites
structural work
construction services
renovation work
public works
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors