Awarded

New Art Gallery - Heat Decarbonisation

Descriptions

The Council is looking to appoint a single competent principal contractor to undertake decarbonisation works at the New Art Gallery Walsall. The project comprises of the following items to be partly funded by Salix via the PSDS 3c: o Strip out and removal of the existing gas boilers. o Replacement of the inverted roof system with new warm roof deck on the 4th floor to provide a 20-year insurance back warranty. o Installation of new handrail system to the roof and bigfoot system for ASHPs. o Installation of new ASHP and Water to Water Heat Pumps. o Associated fire-stopping works. The Council procured expert consultants to undertake carbon auditing across its estate including leisure facilities. For the New Art Gallery the following measures have been recommended, funding permitting: o Installation of an air source heat pump. o Installation of secondary glazing. o Installation of tap flow restrictors. o AtkinsR?alis have made a strategic assessment of the economic and sustainable approach which is the installation of a renewable heating system (air source heat pump). The proposal is to install: - Install a Mitsubishi NX-N Range air source heat pump with a 400v 3ph 50 Hz Phase Power plus DOL starter. - Install an accompanying Mitsubishi EW-HT range water-to-water heat pump with a 400v 3ph 50Hz Phase Power output. - A structural survey has been undertaken identifying the lower roof of the Gallery as being the only suitable location for the air source heat pump to be installed. The loading of the unit is to be spread using a Big Foot load spreading system. - The annual forecast energy savings following the works is estimated to be 270,684kWh. - Reduce the carbon emissions by 86.04tCO2 per year based on the Salix PSDS 3C application. - The investment will provide an immediate impact on the heating and energy demands of the Gallery. Programme Designs provided within this tender are up to RIBA Stage 4. The Council aim to award the contract by 7th March 2025 and works to be completed at the earliest opportunity subject the manufacturing lead times/weather conditions, envisaged July 2025. The route to market being used is a direct award under the Pagabo Decarbonisation Solutions framework. The framework is 0.25%, which is charged monthly to the winning contractor. Budget Circa ?798,000.00 of which ?332,583.99 comprises of grant funding provided by Salix. Under the grant funding terms, all grant funding must be drawn down and spent by the 31st of March 2025. Insurance Requirements o Employers' liability - a minimum of ?5 million. o Public liability - a minimum of ?10 million. o Professional indemnity - a minimum of ?1 million Procurement Timetable Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the Council does not intend to depart from the timetable, i...

Timeline

Published Date :

6th May 2025 10 days ago

Deadline :

3rd Mar 2025 2 months ago

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors