Closed
Northumberland Energy Park (Phase 1)
Descriptions
Further information will be provided in the Selection Questionnaire (SQ) and Invitation to Negotiate (ITN) documents however in summary, the scheme consists of, but is not limited to,Site clearance and removal of vegetation, topsoil and hardstanding.Ground remediation as necessary, of the localised soils and groundwater’s.Removal of relic structures.Construction of a deep berth extension of the ash barge dock to allow vessels with a draft of up to 9.0m to use the berth.Formation of a new piled quay wall on land, excavating existing soils between the new wall and existing wall and breaking out existing relic structures and finally removing the existing quay wall.Dredging with suitable batters formed between the dredge pockets and the tidal basin and a 10m wide open quay structure formed at the rear of the existing dock using tubular steel piles.Construction of a new open quay structure to the landward end of the existing ash barge dock.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71322000 - Engineering design services for the construction of civil engineering works
45112330 - Site-reclamation work
45241100 - Quay construction work
45244000 - Marine construction works
45252124 - Dredging and pumping works
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors