Closed

NWGN Route 1 Site Investigation - Site Investigation Works for Route 1 of North West Greenway Network

Descriptions

The project involves the construction of a new greenway on the route indicated on drawings GI-LOC2 to GI-LOC15. The greenway will generally consist of a 3 metre wide paved surface with landscaped borders and boundary fencing. Geographic constraints will require the provision of a number of retaining structures, bridges, ramps, boardwalks and other structures over and above the base pavement.A site investigation is required to verify the ground stratigraphy and to determine the most appropriate pavement design and design of structural foundations ag boardwalks, bridges and culverts.As part of the works, the Contractor shall be required to undertake the role of Project Supervisor Construction stage (PSCS).Site investigation, geo-environmental investigation, in-situ tests, laboratory tests and Engineer’s geological report with discussion and recommendations.The locations of individual trial pits and boreholes are indicated on drawings GI-LOC2 to GI-LOC1

Timeline

Published Date :

8th Jun 2020 4 years ago

Deadline :

22nd Jun 2020 4 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors