Closed
Old Bawn Community School - Mechanical works to the boilerhouse and heating centre in Old Bawn Community School, Old Bawn, Tallaght, Dublin 24.
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
This project is an emergency works mechanical project that entails upgrading works to the existing boilerhouse and heating centre for Old Bawn Community School main school building. The works include replacing the existing oil boilers in the boilerhouse with new gas condensing boilers installed in a cascade arrangement, new flues to suit the new boilers, new MCC controls system, new heating services pipework, new gas services pipework, new heating plant, etc. The existing fuel source to the boilerhouse of oil shall be replaced with a new LPG gas supply that shall come from a new LPG gas tank compound which shall be provided as part of this contract. Refer to the Invitation Letter and the documents attached to this advertisement for a detailed description of what works are to be completed.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71334000 - Mechanical and electrical engineering services
51120000 - Installation services of mechanical equipment
71333000 - Mechanical engineering services
45351000 - Mechanical engineering installation works
45350000 - Mechanical installations
51100000 - Installation services of electrical and mechanical equipment
Keywords
motor install
M&E consultancy
M&E engineering
gearbox coupling
pump mounting
generator wiring
security system mount
M&E technical services
mechanical system setup
mechanical analysis
electrical panel mount
control panel fitting
pump skid installation
machinery engineering
HVAC system setup
integrated M&E services
machinery mounting
gear reducer mounting
mechanical drafting
switchgear commissioning
compressor base leveling
belt conveyor setup
skidding system assembly
M&E design and maintenance
plant equipment installation
mechanical electrical coordination
mechanical and electrical systems design
process equipment fitting
mechanical systems design
mechanical equipment commissioning
hydraulic press installation
mechanical prototype development
mechanical installation work
mechanical equipment consulting
heavy machinery integration
mechanical electrical installation
mechanical installation services
mechanical problem-solving
mechanical engineering installation
building systems engineering
mechanical maintenance engineering
compressor foundation alignment
mechanical component design
precision plant installation
mechanical anchor bolting
machine foundation alignment
HVAC and electrical engineering
conveyor belt installation
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :