Open

Paper-based Feasibility Study and Possible Future Demonstration of Mature Solutions for Improving Ai

Descriptions

Radar. Air defence radar. Radar apparatus. Radar surveillance equipment. Wind farm. Wind turbines can adversely affect a number of MOD operations including radars, seismological recording equipment, communications facilities, naval operations and low flying. These effects are not limited to specific geographical areas. The size of wind turbines as well as the geographical footprint of the next generation of wind farm developments are expected to grow significantly and exacerbate the challenges posed to the UK’s AD infrastructure. A solution is required to enable the continued operation of military AD surveillance capability in the presence of current and future wind turbine developments.

Timeline

Published Date :

10th Dec 2019 5 years ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

31121340 - Wind farm

38115000 - Radar apparatus

38115100 - Radar surveillance equipment

35722000 - Radar

35723000 - Air defence radar

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors