Closed
Phase 1 - AHU Installation (Chiller Project) @ Good Hope Hospital
Descriptions
AHU Install @ Good Hope Hospital The air handling unit is required for this project as follows: 1)1No. Supply and extract air handling unit with heat recovery 2)The air handling unit is to be located on the flat roof in a purpose built roof top plantroom adjacent to the existing Theatre 7 AHU and existing Building 95 chillers as indicated below. 3)The manufacturer shall include for lifting the AHU sections onto a pre prepared support structure on the roof and for assembling it in situ ready for future connection by a mechanical contractor. As a minimum the roof of the plantroom enclosure will not be built until the AHU sections are craned into position and fully assembled. 4)The new air handling unit is required to be delivered and in place on the roof by the 31st March 2021
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors