Closed

Phase 5, Hillington Square King's Lynn

Descriptions

The Hillington Square estate, constructed in the 1960s, comprises 320 units in 15 blocks bedsits, flats and maisonettes. The estate was transferred as part of a large scale voluntary stock transfer to the Freebridge Community Housing (FCH) in 2006 from the Borough Council Kings Lynn and West Norfolk. Approximately 56 units have been sold under the Right to Buy and therefore are owned by leaseholders. A feasibility exercise in late 2006 told FCH that refurbishment of the estate rather than complete demolition and rebuild was the only option viable. FCH are now looking to appoint a main contractor to undertake Phase 5 of the project comprising the refurbishment of Colby, Aitken, Norris and Farrow House (complete), Ladysmith and Vicarage House (part), complete with new vertical access cores including all associated demolitions, drainage, utilities and external works. The estimated value of Phase 5 of the project is 9 800 000 GBP excluding VAT.

Timeline

Published Date :

26th Jan 2019 6 years ago

Deadline :

6th Mar 2019 6 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

construction work

building construction

civil engineering

infrastructure projects

site construction

building sites

structural work

construction services

renovation work

public works

building demolition work

wrecking work

earthmoving

building dismantling

site clearing

excavation work

demolition services

heavy earthwork

structural demolition

site preparation

multi‑dwelling construction

individual housing

apartment building works

residential units

housing projects

domestic buildings

low‑rise flats

clustered housing

family homes

domestic dwellings

road-maintenance works

periodic road repair

asphalt patching

pothole repairs

road surface upkeep

preventative roadway maintenance

carriageway maintenance

road sealing works

highway maintenance services

roadway upkeep tasks

metalled path work

paved walkway construction

surfaced footpath build

gravelled surface installation

communal path erection

recreational path surfacing

stone-surface pedestrian path

metalled cycle/foot corridor

rural path construction

surfaced route build

roof repair and maintenance

leak sealing

tile replacement

shingle repair

waterproof membrane fixing

flashing repairs

structural roof checks

roof inspection service

preventative maintenance

rooftop upkeep

scaffolding work

scaffold installation

access platform setup

temporary structure build

scaffold safety installation

mobile scaffold fitting

tower scaffold erection

industrial scaffold works

construction access system

modular scaffold assembly

structural steel erection for buildings

building steel frame installation

steel structure erection for buildings

architectural steel installation

building support steelwork

construction steel frame

building superstructure steel

multi-storey steel erection :contentReference[oaicite:5]{index=5}

pile-fabrication

pile manufacturing

driven pile assembly

bored pile production

foundation pile manufacturing

offshore pile fabrication

structural piling fabrication

environmental improvement works

ecological restoration civil works

landscape enhancement works

remediation infrastructure

habitat restoration structures

cladding works

exterior wall panels

façade cladding installation

rainscreen systems

building envelope cladding

asbestos-removal work

hazardous material abatement

asbestos stripping

friable asbestos removal

controlled demolition of asbestos

metalworking

structural metal fabrication

custom metal forming

steel component manufacture

industrial metal shop work

balcony construction

balcony repair

balcony installation

outdoor platform works

structural balcony build

terrace extension

balcony maintenance

cantilevered balcony works

decorative balcony erection

residential balcony fitting

building installation

technical fit-out

interior system installation

service integration

construction finish works

MEP works

systems installation

building service deployment

final construction stage

interior infrastructure install

lift installation

elevator fitting

vertical transport system

building lift system setup

passenger lift works

freight elevator installation

mechanical hoist fitting

shaft and lift cabin install

escalator and lift combination works

internal lift system

building completion work

finishing trades

interior and exterior finishing

completion civils

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors