Closed
Place 077 - Major Maintenance to Harrington Bridge Sawley
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The scheme involves major maintenance to the 60m long twin span Harrington Bridge which carries the B6540 over the major River Trent just south of Sawley Derbyshire. In brief the works include carriageway resurfacing, replacement of expansion joints, maintenance painting to the bridge elements, steelwork repairs / replacement to the bridge and central pier, installing a reinforced concrete leaf at the central pier, diving inspections and design of permanent structural elements (structural tie to the central pier). The works will include the Contractor to design both permanent and temporary works above and below the waterline. The Contractor is required to have specialist knowledge of working within an open river environment.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
44212100 - Bridge
44212120 - Structures of bridges
44212110 - Bridge sections
45221000 - Construction work for bridges and tunnels, shafts and subways
Keywords
girders
bridge
viaduct
subway build
footbridge
structural span
bridge sections
bridge decks
crossing structure
substructure works
shaft erection work
structures of bridges
prefabricated span units
bridge frameworks
bridge superstructures
urban transit structure
modular bridge panels
viaduct and underpass building
transportation passage construction
overhead and underground crossing construction
prefabricated bridge components
bridge structural systems
bridge and tunnel construction
tunneling and bridging build
civil crossing facilities
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :