Closed

Port of Dover Maintenance Dredging 2023

Descriptions

The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt.With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010.Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor.Pre and post dredge formal contract surveys using a multi-beam echo sounder, resulting in near total seabed coverage, shall be commissioned by the Employer from an independent survey Contractor.

Timeline

Published Date :

28th Mar 2023 2 years ago

Deadline :

27th Apr 2023 2 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

98360000 - Marine services

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors