Open Closing in a 1 month
Portsmouth City Centre North Development
Descriptions
INTRODUCTION
Portsmouth City Council - the 'Council' - with support from its appointed development consultants Mace, Montagu Evans and Vail Williams - is seeking to engage with a cross section of site wide muti-use and specialist developers in respect of its plans for regeneration of the City Centre North (CCN) strategic area.
The Council anticipates partnering with a lead developer to deliver the scheme across multiple phases, and potentially a range of uses. The Council is also interested in speaking with specialist developers of specific uses to test their feasibility. The Council considers that the following specialist uses could be of relevance to CCN development:
• Multi-family Build to Rent (BTR) / Co-living
• Single family BTR
• Extra care
• Key worker housing
• Purpose Built Student Accommodation
• Hotel
• Offices
KEY OBJECTIVES
The Council is aiming to transform the northern part of the city centre. The plans will the see the redevelopment of the former Tricorn and Sainsbury's sites, which the Council bought to unlock the opportunity for long-term regeneration of wider area.
The plan focuses on making the best use of this large area by creating new homes, new walking and cycling routes and a large open green space stretching from St. Agatha's Church to All Saints' Church. By bringing more residents into the area, the project should not only deliver more homes for local people, but also more customers for shops, restaurants and other businesses in the city centre.
The project will support and address growing city centre housing market demand for a quality product with mixed tenure options.
The City Centre North project has extant outline planning consent which focuses on:
• The future of the city centre and environmental needs
• What residents have been telling us through the Local Plan survey and the Imagine 2040 City Vision
• Joining up logically with our other projects in the city centre
• Supporting the need for sustainable, affordable homes
• Enabling a greener city with easier travel
• The local community but also considers attracting visitors
The development will include the construction of a phased, mixed-use scheme comprising:
• Up to 10,000 sqm GIA of non-residential uses (Use classes E, F1, F2)
• Up to 2,300 housing units
• 22,400 sqm new green open spaces and public realm
The development will transform a 13.25 ha predominantly brownfield site into a new and attractive city quarter with a large central green space. The enhanced public realm and legible connections across the site will allow natural footfall and permeability from the city centre and surrounding residential areas.
PHASING
The project is split into two phases as per the extant planning consent:
• Phase 1 comprises two buildings delivering 550 new homes, non-residential floorspace and associated landscaping and access work, including part of the new public green space. The buildings form a courtyard arrangement which maximise views into and interacts with the green space.
o 70/30 split between private sale & affordable tenures.
o Affordable tenures split 70/30 between affordable rent & shared ownership.
o 164 sqm of flexible commercial space (Class E, F1 or F2).
• Phase 2 comprises a series of residential or mixed-use development plots, including the remainder of the new green space.
o Later phases have an increased ground floor mix of retail and food & beverage to activate spaces and bring footfall through the development.
o The City Centre Roads scheme will reconfigure the adjacent road network and promote priority to public transport, walking and cycling.
o Outline planning permission has been granted for:
Up to 1800 dwellings
Up to 9,840 sqm GIA of non-residential uses (Use classes E, F1, F2)
Completion of 22,400 sqm new green open spaces and public realm
It is envisaged that Phase 1 can be delivered without any changes to roads in the area. Phase 2 will require the highway network to be changed to create space for the new developments, which will include walking and cycling routes alongside accommodating cars and buses.
PLANNING STATUS
Permission to grant Outline planning permission was approved in autumn 2023. The outline planning application states:
'demolition of existing buildings and the construction of a phased development of up to 2,300 residential units (Use Class C3), up to 10,000sqm non-residential uses (Use Classes E, F1 and F2), and associated servicing facilities, parking, plant space, open space (including a public park), landscaping, access and highways works. Phase 1 to comprise residential units and non-residential uses with full details of access, layout, scale and appearance provided, with landscaping reserved. Subsequent phases to comprise residential units and non-residential uses with details of strategic means of access provided with all other matters reserved.'
A link to the publicly accessible planning application and document pack is included below:
https://publicaccess.portsmouth.gov.uk/online-applications/applicationDetails.do?keyVal=RH48KUMO0OE00&activeTab=summary
The application has been kept flexible. It identifies the potential range of land uses and capacity of development that could be delivered on the site. It also identifies the broad locations for potential new buildings, new pedestrian and cycle priority routes, and new shared spaces, including the creation of a significant open green space for Portsmouth.
The application also shows how the land might be developed over time and how it will relate to the existing and future road network. It also considers in detail how several existing environmental, land ownership and physical issues might be addressed to deliver the improvements needed in the area.
ROAD NETWORK & INFRASTRUCTURE
The reconfiguration of the city centre roads would complement and support Portsmouth's Vision for the city centre, resulting in a city less dominated by private vehicle traffic and parking, and a place where use of sustainable modes of travel is the norm for many more people than today. The CCR proposal is supported by complimentary proposals for sustainable transport schemes including the Tipner Transport Hub and development of the SEHRT network.
The totality of the infrastructure improvements required to deliver the City Centre North Masterplan is yet to be fully understood in detail, however, to date a detailed options development and appraisal process has been undertaken in line with DfT's best practice for the City Centre Roads project considering the scheme objectives, impact on the city transport network and impacts on the wider development amongst other factors. The option development process is outlined in the Option Assessment Report (OAR) and its associated Addendum, produced by Stantec, on behalf of PCC which can be shared with the successful Supplier upon award.
An overview of the current preferred design and its key features are detailed in turn below:
• Conversion of Hope Street to facilitate two-way traffic;
• Retain Church Street as two-way;
• Conversion of Lake Road and Commercial Road into a clockwise gyratory;
• Closure of Marketway to all vehicles. Buses currently using Market Way will be diverted to Charlotte Street which will become two-way;
• Segregated two-way bus lanes on Commercial Road and Lake Road; and
• New and upgraded pedestrian and cycle facilities, with a new active travel network across the development site and integrating with existing and aspirational city-wide facilities.
The City Centre Roads project is currently expected to be funded from the DfT's Major Road Scheme RIS3 Fund with the Strategic Outline Business Case currently being finalise for submission, although the exact figure has not yet been determined. There is potential to secure funding from the private sector through the planning process (which is still to be undertaken) such as through S106 agreements, but opportunities to do so have not yet been identified.
It should be noted that in parallel to the work being delivered under this contract, a separate contractor review of the roads scheme will be undertaken to review the affordability and buildability of the Infrastructure elements.
LAND ASSEMBLY
The Council now owns approximately 64% of the land within the scheme boundary, leaving the balance of 36% with third parties. In summary the remaining third-party land includes a number of commercial units on Commercial Road such as those occupied by Argos and McDonalds, some light industrial units on Frederick Street and one on Clarence Road, a petrol station and some commercial units with residential above also on Commercial Road.
In accordance with the Land Acquisition Strategy produced by Gateley Hamer and dated December 2023, the Council has continued to progress with acquiring third-party property assets that fall within the red line regeneration area boundary through negotiation and agreement. The strategy and red line ownership plan are included within the documents accessible via the Council's e-sourcing system In-tend.
CCN - FURTHER INFORMATION
Further information regarding the project can be accessed publicly via the web-link below which includes for location plans, masterplan artists impressions, strategic context, etc.
https://portsmouthcitycentre.co.uk/future-plans/city-centre-north/
Further additional information such as additional artists impressions and key facts about Portsmouth is included for within the City Centre North - Summary Marketing Leaflet accessible via In-tend.
Timeline
Pretender :
Not Identified
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
70333000 - Housing services
70120000 - Buying and selling of real estate
45214700 - Construction work for halls of residence
70310000 - Building rental or sale services
45212413 - Short-stay accommodation construction work
45215214 - Residential homes construction work
45233100 - Construction work for highways, roads
45213316 - Installation works of walkways
45100000 - Site preparation work
45213100 - Construction work for commercial buildings
45212411 - Hotel construction work
45213312 - Car park building construction work
70332200 - Commercial property management services
45215212 - Retirement home construction work
71200000 - Architectural and related services
45212420 - Construction work for restaurants and similar facilities
70130000 - Letting services of own property
45211200 - Sheltered housing construction work
70320000 - Land rental or sale services
45213150 - Office block construction work
50700000 - Repair and maintenance services of building installations
45211100 - Construction work for houses
45212170 - Entertainment building construction work
45215210 - Construction work for subsidised residential accommodation
45215213 - Nursing home construction work
45212400 - Accommodation and restaurant buildings
45211340 - Multi-dwelling buildings construction work
70110000 - Development services of real estate
45211360 - Urban development construction work
71400000 - Urban planning and landscape architectural services
45211350 - Multi-functional buildings construction work
45211341 - Flats construction work
45233161 - Footpath construction work
45223300 - Parking lot construction work
45236250 - Flatwork for parks
70200000 - Renting or leasing services of own property
70331000 - Residential property services
45233162 - Cycle path construction work
45213112 - Shop units construction work
45231100 - General construction work for pipelines
71300000 - Engineering services
45211300 - Houses construction work
70332100 - Land management services
Keywords
accessible dwelling construction
single-family houses construction
multi-dwelling buildings construction
residential complex construction
multi-unit housing construction
residential apartment building
multifunctional facility erection
adaptable building construction
entertainment building construction
entertainment complex erection
recreational venue construction
hospitality building construction
lodging and dining facilities build
restaurant structure construction
hotel/restaurant building works
hostel and eatery construction
hospitality infrastructure build
upper-tier hospitality structures
serviced apartment construction
hospitality suite construction
restaurant building construction
commercial building construction
commercial complex construction
commercial office building construction
multi-level parking construction
automated car park construction
hard-surface walk installation
hostel accommodation construction
on-campus housing construction
government-supported residence
public subsidy housing facility
community rental housing construction
retirement housing construction
elderly residence construction
long-term elder care construction
elderly health support building
vehicular corridor construction
transport highway construction :contentReference[oaicite:1]{index=1}
pedestrian walkway installation
dedicated cycling infrastructure
park pathways slab installation
sanitary installation maintenance
development project management
proprietary real estate letting
real-estate building brokerage
residential building maintenance
terrain administrative services :contentReference[oaicite:1]{index=1}
commercial real estate management
retail property administration
corporate property maintenance
residential accommodation services
specialist engineering services
technical engineering solutions
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors