Project Management of Phase 2 Cheese Plant Expansion
Descriptions
The expansion of SCC’s core cheese business plus the re-development of key infrastructure:• Production Capacity: 13,500 tonnes (now); 21,000 tonnes (post)• Daily Milk Processed: 360,000 litres (now); 585,000 litres (post)• Cheese vats per day: 16 (now); 26 (post)• Cheese packing per yr: 5,500 tonnes (now); 10,000 tonnes (post)-Management of 5 work packages (a to e):• Process design and equipment selection review.• Facility and services design review.• Tendering• Project management: installation, construction, health and safety and risk management, FATs & SATs.-a)Extra 2 cheese process lines to the existing 4.•Additional pasteuriser, separator and standardiser•2 cheese Vats, vats 5 and 6. The 4 vats currently installed on site are Tetra Pak 22,500L OST CH5.•2 15.3m draining and finishing tables, tables 5 and 6.•Curd conveyor extension to the towers to cover tables 5 and 6.•40m2 plant cleaning (CIP) process room to be constructed.•Process automation, control and SCADA integration. Site standard is Schneider.-b)Whey Processing plant replacement and relocation.•Replacement Reverse Osmosis (RO) constituent recovery treatment plant to handle an hourly rate of 30,000 lph (current 24,000plh) concentrating to a minimum 24% total solids.•150m2 plant process room to be constructed.•Installation of new: 2 x 60m3 raw whey holding tanks, whey clarifier, cream separator and pasteuriser, two 6m3 cream storage tanks.•Whey pasteuriser. RO system for concentration from 6.4% T.S. to 24. 2 x 150m3 concentrate storage silos. Stored concentrate from either silo will be pumped to a dispatch point for tanker loading. RO permeate “polisher” filtration system.•Central Glycol cooling plant to provide c. 1,242kW of cooling to the whey process.•Process automation, control and SCADA integration. Site standard is Schneider.-c)Milk Reception and Storage facility replacement and relocation.•Milk tanker “drive-through” access, pumped multi-point off-take and CIP facility, including a weighbridge.•6 x 150,000 litre raw milk silos and CIP.•Process automation, control and SCADA integration. Site standard is Schneider.-d)Retail Packing equipment purchase and installation•Automated infeed line, from low to high care, to multiple lines.•Portion line up-to 1kg pack weight: pre-cutter, intelligent portion cutter, wrapper, labeller and pack station.•Treif/Variovac sliced line improvements: infeed conveyor plus line balancing.•Process automation, control and SCADA integration. Site standard is Schneider.-e)Steam Generation Plant (Boilers)•192m2 boiler house to be constructed.•Gas feed to site.•2 x gas fired boilers with flue gas economisers rated at 7,000Kg/hr ea. to provide a maximum steam output of 14,000Kg/hr to meet site needs.•Process automation, control and SCADA integration. Site standard is Schneider.•To comply with arrangement 3 per regulation BG01.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=104257.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
15510000 - Milk and cream
15500000 - Dairy products
15544000 - Hard cheese
15540000 - Cheese products
15541000 - Table cheese
15554000 - Whey
71541000 - Construction project management services
72224000 - Project management consultancy services
42162000 - Steam-generating boilers
42211000 - Dairy machinery
15543200 - Cheddar cheese
Keywords
milk and cream products
cheese butter yogurt range
liquid and solid dairy supply
fermented and fresh dairy
drinking milk varieties
culinary cream types
liquid dairy ingredients
pasteurised and UHT cream/milk
cheese products
processed cheese range
variety of dairy cheeses
packaged cheese assortments
table cheese
sliced cheese block
cheese for sandwiches
ready-to-serve cheese
aged cheddar block
mild to sharp cheddar
sandwich cheddar slices
bulk cheddar wheels
English pressed cheese
firm block cheese
pressurized mature cheese
cheddar-style hard cheese
grating and slicing cheese
whey liquid by-product
protein-rich dairy whey
cheese production residue
diets and sports supplement
bulk dairy liquid
steam boiler
steam generator
industrial steam unit
boiler plant
packaged steam boiler
boiler house
steam heating system
boiler module
boiler installation
boiler equipment
dairy processing equipment
milk separator
cream separator
butter churner
cheese vat machine
milk pasteurizer
yogurt mixer
dairy plant unit
dairy line equipment
milk processing system
construction project management
project scheduling
budget planning
resource coordination
risk management
stakeholder liaison
quality assurance planning
contract administration
procurement oversight
progress reporting
milestone tracking
construction coordination
regulatory compliance monitoring
value engineering
site logistics planning
project governance design
PMO setup
stakeholder management planning
schedule optimization
risk management consulting
resource allocation planning
critical path analysis
project health assessment
performance monitoring
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors