Awarded
Prototype Study: Corridor & Inpatient room Interfaces & Spatial Verification
Descriptions
The construction, hosting and dismantling of a low fidelity, full scale prototype corridor and in-patient bedroom (including partition interfaces and an ensuite bathroom pod)
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
Construction structures and materials
on-site assembly
fixture installation
equipment alignment
control panel setup
piping system installation
lighting fixture mounting
non-software integration
hardware commissioning
structural bracket installation
mechanical anchor setup
architectural services
building engineering
technical design
construction consultancy
structural engineering
inspection services
surveying
planning consultancy
civil engineering
facility design
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors