Closed

Pyle Swimming Pool Refurbishment

Descriptions

Bridgend County Borough Council and Halo Leisure are embarking on a journey to develop the changing rooms at Pyle Swimming Pool.The aspiration is for the male and female changing areas to be updated and refurbished to a more modern standard. This will include internal decorations within the areas and layout as well as accessibility changing areas considered for both Pyle and Pencoed Swimming Pool.This is part of a contract obligation with Halo and BCBC.Aims & ObjectivesThe objective of the area is to provide a place which delivers a sustainable product with .Improves accessibility for customers and all user typeCreates a more modern environment for the centre for customers to change inImprove sustainability of the area as well as being energy efficientTo increase participation through the delivery of different spaceCORE REDEVELOPMENT REQUIREMENTSExternal – Approach OptionsThere are two options under consideration regarding the external approach, entry point and reception provision to the new Health Hub facilities. The decision as to which option is finally agreed will be based on the most economically and technically advantageous option for the Health Hub partners.2.1 Option - Changing PlacesWith these there is a need to improve accessibility for users at both Plyle and Pencoed. Both have limited provision at present and options at both sites should be included in the tender.There are current small rooms at both locationsThere are other locations within the centres that could be consideredConsideration should be taken to include within the refurbished changing roomsBridgend County Borough Council and Halo Leisure are embarking on a journey to develop the changing rooms at Pyle Swimming Pool.The aspiration is for the male and female changing areas to be updated and refurbished to a more modern standard. This will include internal decorations within the areas and layout as well as accessibility changing areas considered for both Pyle and Pencoed Swimming Pool.This is part of a contract obligation with Halo and BCBC.Aims & ObjectivesThe objective of the area is to provide a place which delivers a sustainable product with .Improves accessibility for customers and all user typeCreates a more modern environment for the centre for customers to change inImprove sustainability of the area as well as being energy efficientTo increase participation through the delivery of different spaceCORE REDEVELOPMENT REQUIREMENTSExternal – Approach OptionsThere are two options under consideration regarding the external approach, entry point and reception provision to the new Health Hub facilities. The decision as to which option is finally agreed will be based on the most economically and technically advantageous option for the Health Hub partners.2.1 Option - Changing PlacesWith these there is a need to improve accessibility for users at both Plyle and Pencoed. Both have limited provision at present and options at both sites should be included in the tender.There are current small rooms at both locationsThere are other locations within the centres that could be consideredConsideration should be taken to include within the refurbished changing roomsExisting Building DesignPyleMens change ceiling is 600 x 600 lay in grid system with flush fitting tilesLadies change is 600 x 600 lay in grid system with rebated tilesVentilation grilles are of varying sorts with no uniformity and appear to be installed “where possible” rather than to provide adequate well spread ventilationShowers are currently of a push button type with chrome pipework and fixed head outlets fed from a single mixer (type unknown). There are 4 no. of showers in each changing area.All wet areas currently have tiling that is of 2 colours with an interim detailed border tile. All other walls are painted.Lighting is currently achieved with 5ft fluorescent battens mounted below the ceiling grid. There is no local control of the lighting in these areas and switching is achieved from reception only.Recommendations -RecommendationsCeilingStandard 600x600 (white) grid system with flush fitting tiles suitable for the area they are installed in. Due to the ceiling height in the shower areas it may be appropriate to utilise a solid tile construction within the ceiling grid.VentilationSupply and Extract grilles (white) located into ceiling with ductwork adapted above to suit. Locations should be as per drawing to ensure adequate ventilation across the areaLightingThe wiring for the lighting appears to be in a galvanised lighting trunking above the ceiling although there are cables hanging over ductwork. The wiring is anticipated to be original and as such consideration to rewiring the area with new containment and local detection sensors should be considered.Lay in 600 x 600 LED ceiling panels spaced to achieve uniform lighting spread across the area. Lighting must be suitable for the environment.Emergency lighting should be installed and stand alone from the main lighting with suitably located test points or remote test facility.Agreement on cubicle design and layout must be agreed and drawings issued to the electrical contractor in order to achieve a suitable lighting design layout.Fire alarm #(see note 1 below)Detection below and above the ceiling is required due to the void height above. Detectors should be suitable for the environment they are to be installed in with adequate audible and visual warning notification for customers.The alarm should be to L2 standard.ShowersThe existing system should be replaced with a RADA Outlook mixer and fixed shower heads, which can be installed to accommodate 6 outlets in total. This mixer could also be used to feed 2no. of wash hand basins. All shower heads to be fitted with 6ltr/min flow restrictors.Power supplies to the shower mixers will be required and should be installed to comply with the latest wiring regulations. Chasing of walls prior to over boarding to accommodate the installation of shower sensor wiring within containment to allow for changing at a later date will also be required.Wall finishesWithin the shower areas the tiles should be removed, walls repaired where required to provide a solid substrate to allow fixing of full height shower boarding throughout.All other walls are painted and will require preparation prior to repainting.Floor finishesWhere walls are removed floors are to be repaired with a similar matching tile of non slip format. Floors are not being replaced so adequate protection must be applied prior to works commencing by any trades.Cubicles & LockersA suitable design to achieve the most efficient use of space should be provided. Family changing cubicles should also be considered within the design. Consultation with the partnership manager for the area and centre manager should be had to achieve project goals.Installation drawings will be required and supplied on request to the electrical contractor as early as possible within this project.Cubicles and any other support structures should be of a suitable construction for the environment they are to be installed in.Lockers are to be of varying sizes, a padlock system is to be used for securing lockers. Padlocks will be provided by customers.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=113534.

Timeline

Published Date :

25th Aug 2021 3 years ago

Deadline :

24th Sep 2021 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors