Awarded
Quantity Surveying Services for the Arc Leisure Facility Development
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Bolsover District Council (BDC) is seeking a Quantity Surveyor to work alongside staff throughout the delivery of The Arc Leisure Facility Development. The Authority has taken on an ambitious development of the current main administration building working with Pulse Fitness to extend the current leisure facilities on site providing the following: 25m x 6 lane swimming pool 12m x 5m deck level learner pool Water slide feature Poolside thermal suite consisting of sauna, steam room, ice room, etc. Children’s soft play area Cafeteria/vending area New village changing facilities Enlarging the existing gym facility 2 new dance studios 1 new spin studio Some of these features will be incorporated within the existing building fabric but there will be a large new build extension that incorporates the vast majority located to the rear of the building. (See plans attached to appendix A). The development is part of a number of projects that will help BDC to achieve the aims set out within the corporate plan and the vision to enhance and improve the wealth profile, well-being and quality of life for the communities of Bolsover District.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
facility design
technical design
surveying
structural engineering
civil engineering
construction consultancy
planning consultancy
architectural services
inspection services
building engineering
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :