Closed

Quotation for a 10 Brl Brewery with associated equipment and including installation

Descriptions

We require a quotation to supply a complete 10 Brl Brew house along with five Dual Purpose Vessels (DPV’s) for an existing brewery looking to upgrade and have the equipment installed in their new premises by mid-2019. The brewery will require a full installation package along with the supply of the vessels. Also, you have the option to quote for the supply of a suitable glycol chiller with associated pipework to service the CLT and DPV’s.The outline descriptions of the individual vessels required is set out below but please get back to us with any queries regarding the vessels or fittings.All vessels should be free standing and fabricated from 304 grade stainless steel. All the brewing vessels should be fully insulated and be clad with stainless steel sheet and supplied with all necessary fittings. The Dual-Purpose Vessels should be able to be pressurised to no more than 0.5 bar.The brewery is to be powered by three-phase electricity in the form of immersion elements in the Wort Copper and Hot Liquor Tank.Details of individual items of brewplant required:1) Grist Case + HydratorTo take 350 kg Grist2) Hot Liquor Tank: Cylindrical Tank, Gross Capacity 2,250 litres.Tank to be fully enclosed with top manway access.2 x 12 kW Immersion HeatersTop Liquor Inlet, 1.5" RJTM.Bottom central outlet with 1.5" RJT union to 90° short radius bend and outlet pipe extending to front of vessel ending in a 1.5"RJTF connection.1.5" Overflow pipe.0.5" BSP socket for PT100 temperature sensorFull height sight glass.2) Cold Liquor Tank:Cylindrical Tank, Gross Capacity 2,250 litres.Tank to be fully enclosed with top manway access.Fully insulated with full length sidewall cooling jacketTop filling inlet with ball valve assembly for mains water fillingTop Liquor Inlet, 1.5" RJTM. (for hot liquor return and re-circulation)Bottom central outlet with 1.5" RJT union to 90° short radius bend and outlet pipe extending to front of vessel ending in a 1.5"RJTF connection.1.5" Overflow pipe.0.5" BSP socket for PT100 temperature sensorFull height sight glass.3) Mash TunCylindrical Tank, Gross Capacity 1,400 litresRemovable stainless steel lids.Rectangular side Manway for grains removalRemovable bridge carrying rotating sparge arms.False floor in two halves, fully supported, constructed from wedge wire. Central bottom outlet with RJT union and 90° short radius bend. Outlet pipe extending to front of vessel ending in a 1.5" RJTF connection. (at a height to connect to inlet of Underback.4) Underback Cylindrical, approximately 80 litre capacity.Inlet 1.5" RJTF, Low level tangential entry on the side of the vessel(Height of inlet to match the height of the Mash Tun Outlet).Outlet 1.5" RJTM approximately 1” up from base of vessel5) Copper Cylindrical, Gross capacity, 2,400 litres.Conical top and base.500mm side manway access.300 mm hop dosing port mounted in the top cone.3 x 18 Kw Immersion HeatersBottom cone to incorporate removable hop retaining plate, min 400mm diameter, constructed from s/s wedge wire or perforated plate (1.5mm slots or perforations) fully supported on internal s/s ring located over outlet in bottom cone.Top cone to incorporate 6.0" flue connection and external SS flue pipeTop inlet, 1.5" RJTM connection, with internal elbow to sidewall.Top CIP inlet to internal rotating sprayballBottom centre outlet, 2.0" RJT union, short radius bend and outlet to outer edge of the vessel with reducer to 1.5" RJTF connection.0.5" BSP sockets for PT100 temperature sensorSample valve.6) Dual Purpose Vessels Cylindroconical Vessel, 60º cone(5 of.)Gross Capacity, minimum, 2250 litres eachDouble skinned vessels, fully insulated.Side Manway accessCIP sprayball connection and pipeworkPressure Relief / Anti Vac valvesSplit cooling jackets, Full side wall to 10 Brl fill height line plus cone.Bottom centre inlet/outlet with 1.5" RJTF connection.Mid cone outlet with 1.5” RFTF connectionSocket for PT100 Temperature probeSample valve7) Instrumentation PanelsSupply and installation of two separate panels for Brewhouse and Fermentation control.8) Glycol ChillerA suitable sized glycol chiller along with full pipework installation including insulation. The chiller to service the Cold Liquor Tank and five Fermenting Vessels. (Option to quote).9) Installation:We are ideally looking for a turnkey installation, however at this stage we require a budget sum for supply and installation on site of all the brewplant and vessels including Heat Exchanger (to cool to 17°C), wort & water transfer pumps 3 phase, all tank fittings and all stainless-steel pipe work and control systems. A basic layout drawing can be supplied. We are assuming two weeks’ installation time on site plus up to one-week commissioning prior to brewing.If you require any further information regarding the vessel specifications and their use please do not hesitate to contact me. We look forward to obtaining your quotation as soon as possible.Yours faithfully,David SmithFor and on behalf of Brewing Services LtdNOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=88994.

Timeline

Published Date :

18th Jan 2019 in a 6 years

Deadline :

11th Feb 2019 in a 5 years

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors