Open in a 24 days

Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface

Descriptions

The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. The current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months. Please refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham The works are to be completed by September 2025. Site visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.

Timeline

Published Date :

3rd Apr 2025 Yesterday

Deadline :

28th Apr 2025 in a 24 days

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors