Closed
Request for expressions of interest to participate in early market engagement events Connect Plus M25 Motorway Network Improvements Works Call Off Framework Agreement (COFA 3)
Descriptions
Connect Plus M25 Ltd is employed by National Highways (formerly Highways England) under a DBFO agreement (Design, Build, Finance and Operate) contract to manage and maintain the M25 motorway and all associated arterial link roads (the 'Project Road') over a 30-year period, from 2009. , The works envisaged under this framework agreement will comprise Civil Engineering and Technology improvements instructed by National Highways (including but not limited to structures, geotechnical, junction improvements, roadside technology and environmental) on the Project Road and in some instances, combined with road infrastructure renewals works related to Civil Engineering and Technology., The works will be built into contracted packages optimised to suit needs, often multi discipline and sometimes phased. Direct Contracts awarded under the Framework are anticipated from £100,000 up to £20,000,000. We anticipate multiple contracts shall be awarded each year, for a duration of six years., Connect Plus recognises that in order to fulfil the fundamental principles of the DBFO Contract a fully embedded innovative and integrated supply chain is required which will work in a long-term relationship with Connect Plus and Connect Plus Services (CPS - the Employer's consultant), stakeholders and partners. , Connect Plus have identified that the following cross cutting principles need to be in place throughout its own organisation, Connect Plus Services and the supply chain: , • Leadership and direction , • Long term community relationships and integration (primarily between CP, CPS and the supply chain) , • Innovation and value , The DBFO Contract is a performance contract and Connect Plus's supply chain are expected to work within and develop a performance culture, where delivery of contractual commitments is continually measured. A balanced scorecard approach has been developed for the framework which forms the basis of the procurement evaluation model.
Timeline
Pretender :
Not Identified
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45246000 - River regulation and flood control works
45233280 - Erection of road-barriers
34923000 - Road traffic-control equipment
45233125 - Road junction construction work
45233222 - Paving and asphalting works
71312000 - Structural engineering consultancy services
34924000 - Variable message signs
45233142 - Road-repair works
71311000 - Civil engineering consultancy services
45233292 - Installation of safety equipment
45233130 - Construction work for highways
71335000 - Engineering studies
71313000 - Environmental engineering consultancy services
34996000 - Control, safety or signalling equipment for roads
45111250 - Ground investigation work
45233290 - Installation of road signs
71332000 - Geotechnical engineering services
45233131 - Construction work for elevated highways
45233293 - Installation of street furniture
71510000 - Site-investigation services
45233294 - Installation of road signals
45221000 - Construction work for bridges and tunnels, shafts and subways
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors