Closed

Roofing Systems C4 - KCSL

Descriptions

Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various roofing systems to satellite buildings around the station complex. Those buildings include the following: • South Portal • West Core • East Core • Train Crew and Catering Building • North Portal • Cycle Hub • Interface sub station • East Vent The package includes Various roofing systems and build ups and will include a range of different specification and performance criteria such as: - Polymer primers - Liquid applied waterproofing (to meet required specification) - Various Membrane types (to meet required specification) - Water flow reduction layers (to meet required specification) - Insulation (to meet required specification) - Vapour control layers. - Drainage outlets and assemblies with compatible leaf and gravel guards - Inspection chambers - Concrete paving slabs and pedestals - Zinc double seam standing roof - Aluminium Standing Seam Roofing - Perimeter Gutters - Pressed components/ accessories with a polyester powder coating finish - Drainage edge channel with stainless steel grating - Movement/expansion joints - and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks. Specifications and performance requirements included but not limited to - Materials fire classification BROOF (t4) in accordance with BS EN 13501-5 - Acoustic BS EN ISO 354 ( as required by the acoustic consultants ) - BS EN 507 'Roofing products from metal sheet. Specification for fully supported roofing products of aluminium sheet - Thermal Performance Requirements - BS EN 14782 'Self-supporting metal sheet for roofing, external cladding and internal lining. Product specification and requirements - BS 5427 'Code of practice for the use of profiled sheet for roof and wall cladding on buildings'. - Drainage BS EN 12056: Part 3 and BS 8490 - Condensation with BS 5250, BS EN ISO 13788 The Subsubcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing, manufacture and installation of all roof systems The Subsubcontractor will be responsible for progressing the roofing schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.

Timeline

Published Date :

23rd Oct 2024 in a 2 months

Deadline :

5th Nov 2024 in a 2 months

Contract Start :

1st Jun 2025

Contract End :

30th Jun 2028

Tender Regions

CPV Codes

45261420 - Waterproofing work.

44112500 - Roofing materials.

45343100 - Fireproofing work.

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors