SASWP14 - GRS Staircase, Parapets, Cess Walkways, Stairs
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Subcontractor to manufacture, supply and install the below to the SAS13 Bridge Replacement: - West Abutment - 4 Flight GRP Staircase (approx 7m height) - West Abutment - GRP Parapets - Replacement SAS13 Bridge - GRP Cess Walkway and Parapets to each side of 92m bridge deck - East Abutment - GRP Stairs from NE Wingwall to Abutment - East Abutment - GRP Stairs from NE Wingwall to Cess Walkway - East Abutment - GRP Stairs from SE Wingwall to Cess Walkway - East Abutment - 5 x 5 Step GRP Stairs on NE Wingwall - East Abutment - GRP Parapets to abutment, NE Wingwall, SE Wingwall Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete. The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include: - Quality - Sustainability - Competence - Commercial Price - Etc Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team. Best and final offers may be requested from tenderers. Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3). The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45340000 - Fencing, railing and safety equipment installation work
44212100 - Bridge
44233000 - Staircases
19520000 - Plastic products
45341000 - Erection of railings
45221112 - Railway bridge construction work
Keywords
bridge
viaduct
step units
wooden stairs
bespoke stairs
footbridge
stair assemblies
structural span
railing assembly
staircases
rail span build
plastic containers
crossing structure
site safety enclosures
rail corridor span build
train overpass erection
rail track bridge build
balcony railing mounting
decorative rail erection
fence installation
railing installation
balustrade fitting
crowd-control barriers
stair rail assembly
tubular railing systems
spiral staircases
safety guard rails
track support bridge
guardrail construction
rigid plastic goods
metro bridge erection
safety barrier fitting
handrail mounting
staircase carpentry
straight staircases
rail transport bridge
plastic packaging
injection-molded parts
perimeter security works
timber staircases
metal fence erection
custom rail frameworks
railway bridge construction
rail superstructure construction
stainless steel handrail installation
molded plastic components
railroad crossing structure
protective fencing systems
prefabricated stair units
guardrail installation services
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :