SASWP14 - GRS Staircase, Parapets, Cess Walkways, Stairs

Descriptions

Subcontractor to manufacture, supply and install the below to the SAS13 Bridge Replacement: - West Abutment - 4 Flight GRP Staircase (approx 7m height) - West Abutment - GRP Parapets - Replacement SAS13 Bridge - GRP Cess Walkway and Parapets to each side of 92m bridge deck - East Abutment - GRP Stairs from NE Wingwall to Abutment - East Abutment - GRP Stairs from NE Wingwall to Cess Walkway - East Abutment - GRP Stairs from SE Wingwall to Cess Walkway - East Abutment - 5 x 5 Step GRP Stairs on NE Wingwall - East Abutment - GRP Parapets to abutment, NE Wingwall, SE Wingwall Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete. The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include: - Quality - Sustainability - Competence - Commercial Price - Etc Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team. Best and final offers may be requested from tenderers. Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3). The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.

Timeline

Published Date :

14th Jul 2021 4 years ago

Deadline :

30th Jul 2021 4 years ago

Contract Start :

1st Mar 2022

Contract End :

25th Mar 2022

Tender Regions

Keywords

bridge

viaduct

step units

wooden stairs

bespoke stairs

footbridge

stair assemblies

structural span

railing assembly

staircases

rail span build

plastic containers

crossing structure

site safety enclosures

rail corridor span build

train overpass erection

rail track bridge build

balcony railing mounting

decorative rail erection

fence installation

railing installation

balustrade fitting

crowd-control barriers

stair rail assembly

tubular railing systems

spiral staircases

safety guard rails

track support bridge

guardrail construction

rigid plastic goods

metro bridge erection

safety barrier fitting

handrail mounting

staircase carpentry

straight staircases

rail transport bridge

plastic packaging

injection-molded parts

perimeter security works

timber staircases

metal fence erection

custom rail frameworks

railway bridge construction

rail superstructure construction

stainless steel handrail installation

molded plastic components

railroad crossing structure

protective fencing systems

prefabricated stair units

guardrail installation services

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk