Open Closing in a 2 months

Satellite-Based Leakage Detection and AOI (Area of Interest) Management

Descriptions

Satellite Scanning Requirements - Scan areas of the UU region for leakage detection on: - Drinking water assets - Raw water - Sewage - Scanning frequency: daily, weekly, or full region biannually - Imagery delivery within 4 weeks - Pre- and post-freeze imagery capability - SLA failure rebate for delayed scans - Dynamic pricing based on scan age - Clear availability of satellite scan schedules to support planning and reactive needs AOI Identification & Management - AOIs identified within 100m of UU assets - AOIs classified by leak status: - Quiet - Suspected - Active leak - Repaired - Awaiting repair - Unverifiable - AOI journey fully integrated from scan to resolution - AOI audit trail (e.g., AOIs with no leak detected) - Oldest leaks alert system - Ability to interpret AOIs within defined boundaries and estimate leakage return - Ability to label individual leaks with root cause failure types Mobile App Features - AOI investigation and reporting - Status updates sync with dashboard - AOI search by reference (field/admin) - Capture investigation method (e.g., FIDO) - Offline reporting capability - Send outcomes to manager for review - Performance tracking Dashboard Requirements - Desktop and mobile compatibility - Data layers: - Active and past AOIs - Asset types (hydrants, mains, private services) - Regional and county-level performance views - Leak investigation performance metrics: - Leaks found - AOIs investigated - Daily/weekly outcomes - Leak insights: - Leaks per km - Time to resolve - Full suite of reporting tools - Integration with WaterNet / INS / Campaign Management Integration & Governance - Ingest UU asset records - API interface for data exchange - Link AOIs to INS jobs - GIS integration (ArcGIS) - Satellite governance structure needed - Licence usage tracking - Training on data interpretation (unlimited licences) Benefits - ODI benefit calculation using industry-standard methods - Streamlined leak detection and prioritisation Risks & Gaps - GIS maps sent to Satellite vendor missing key details (material, size, DMZ) - Trunk main investigations lack coordination - Dashboard and mobile app status sync issues - Manual daily reporting - Inconsistent dashboard usage across regions - No standard process for linking AOIs to INS - ODI tracking not embedded Opportunities - Extract AOIs into ArcGIS - Develop API for GIS integration - Split dashboard views by county - Generate reports from AOIs - Link AOIs to campaigns - Introduce AOI audit trail

Timeline

Published Date :

12th Nov 2025 Yesterday

Deadline :

1st Feb 2026 in a 2 months

Contract Start :

31st Mar 2026

Contract End :

31st Mar 2031

CPV Codes

Keywords

water utility operation

water distribution

municipal water system

water infrastructure

waterworks services

water pipeline management

utility services

water supply control

regional water service

public water network

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Framework

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors