Closed

Scottish Trunk Road Network - South East Unit - Forth Road Bridge Side Tower Lateral Thrust Bearing

Descriptions

BEAR Scotland is seeking to appoint a suitably experienced SubContractor to undertake the Side Tower Lateral Thrust Bearing Refurbishment scheme with an estimated value 1.2 million GBP.The Forth Road Bridge is a long span suspension bridge which spans over the Firth of Forth linking Edinburgh to Fife. The side Span is 408m long, Main Span is 1006m long.Two longitudinal stiffening trusses form the basis of the suspended structure, which are connected to one another by regular cross girder trusses.At the Side Towers, the ends of the truss transfer vertical load to the side tower through the vertical rocker bearings which sit on top of reinforced concrete corbels protruding from the side towers. Plan bracing is provided between the east and west trusses in the planes of the top and bottom chords, forming bays of approximately 18m (60feet) in length. The plan bracing transfers the lateral loads (primarily wind) to the Side and Main Towers’ lateral thrust bearings.The side tower lateral thrust bearings have not been replaced since the bridge was built. The top laterals taper down and bear onto a milled bearing block. A gusset plate is bolted to the top of the tapering members. The bearing block is in contact with machined cylindrical surface on the bearing slab, forming a vertical rocker bearing.Three 100mm diameter steel tubes are cast in the concrete and through these tubes, 64mm diameter steel bars are post tensioned securing the bearing blocks. The 64mm dia bars have been assessed to be sub-standard and are in need of replacement. The scheme will require at both side towers:- The installation of temporary access provisions to provide access both externally and internally of the reinforced concrete side towers;- The fabrication and installation of a large steel jacking frame.- De-tensioning and removal of three post tensioned bars sequentially at each location followed by the reinstallation and jacking of replacement post tensioned bars.- Installation of a permanent steel bracing bracket which shall be attached to the side tower by coring and post tensioning bars to the existing concrete; and- Amendments to an existing impressed current cathodic protection system.

Timeline

Published Date :

27th Jan 2022 4 years ago

Deadline :

11th Feb 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

girders

bridge

viaduct

skeleton works

river span build

trunk road build

footbridge

bridge building

structural span

highway building

bridge sections

expressway build

vehicular span build

crossing structure

bridge overhaul works

steel structure build

main road pathway build

vehicular span erection

motorway corridor build

civil bridge restoration

highway construction

bridge erection work

metal frame installation

road bridge construction

span renovation works

transport overpass build

expressway erection

overpass erection

multi-lane highway works

traffic bridge build

structural construction

civil highway span build

bridgework services

bridge refurbishment

steel column assembly

prefabricated span units

structural bridge repair

highway steel bridge

highway bridge building

highway overpass build

crossing infrastructure

steel transport span

major route construction

road pavement works

asphalt span erection

trunk route pavement

steel skeleton building

trunk road construction

civil engineering bridge

civil bridge projects

deck renewal project

structural steelwork

modular bridge panels

steel frame bridge build

industrial steel bridge

superstructure erection

welded steel overpass

bridge construction

road construction

high load steel span

civil bridge building

steel beam erection

span structure construction

transport bridge structure

basic structure construction

bridge superstructure renewal

transport bridge construction

roadway crossing construction

reinforced structure build

transport corridor construction

main logistics road build

arterial road installation

industrial steel erection

prefabricated bridge components

primary highway infrastructure

national highway construction

arterial trunk carriageway build

motorway bridge construction

transport highway construction

interregional road erection

national route development

lifecycle upgrade of bridge

supporting frame assembly

intercity road construction

reinforced steel infrastructure

structural steel erection work

controlled-access highway erection

restoration of existing bridge span

modern steel bridge erection

roadway infrastructure build

steel framework installation

civil structure installation

foundation and framework works

structural crossing infrastructure

bridge rehabilitation construction

structural shell creation

structural steel positioning

load-bearing system build

steel bridge construction

expressway overpass build

structural bridge erection

road-based transport corridor build

bridge superstructure work

structural steel span build

crossing infrastructure build

freeway infrastructure works

vehicular corridor construction

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk