Closed
Scottish Trunk Road Network - South East Unit - Forth Road Bridge - SSUDA Phase 9
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Scottish Trunk Road Unit - South East Unit - Forth Road Bridge – SSUDA Phase 9Beneath the Forth Road Bridge deck there is an existing suspended span under deck access (SSUDA) walkway system which was designed and installed in 1981. It is used for inspection of the suspended span and for carrying out minor remedial works such as painting, replacing bolted connections and maintenance of the deck half joints.The walkways comprise of steel angle and channel sections connected through plated, bolted or welded connections. The walkway mesh is supported on longitudinally spanning angle sections with a maximum span of 3.86m centres between the walkway hangers.The existing system has started to suffer from corrosion and the walkways are under-strength by current standards and is design life expired. The Forth Road Bridge suspended walkway requires removal of the existing steelwork, grit blasting, rehabilitation, galvanising and reinstallation together with strengthening steelwork elements. The refurbishment is required on 5 walkways over an approx. 120m length and includes the installation of new support hangers for temporary staging boards.The works involve the installation of bespoke temporary access system working beneath the Forth Road Bridge and extensive steelwork and painting works.Works are due to commence in Spring 2023 with an estimated value of 1,500,000 GBP.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45221110 - Bridge construction work
45221100 - Construction work for bridges
45221111 - Road bridge construction work
44212100 - Bridge
44212120 - Structures of bridges
45233124 - Trunk road construction work
45221115 - Construction work for steel bridges
45221000 - Construction work for bridges and tunnels, shafts and subways
45221119 - Bridge renewal construction work
Keywords
bridge
viaduct
subway build
river span build
trunk road build
footbridge
bridge building
structural span
bridge decks
vehicular span build
crossing structure
bridge overhaul works
main road pathway build
vehicular span erection
civil bridge restoration
bridge erection work
road bridge construction
span renovation works
substructure works
transport overpass build
overpass erection
traffic bridge build
shaft erection work
structures of bridges
civil highway span build
bridgework services
bridge refurbishment
structural bridge repair
highway steel bridge
highway bridge building
bridge frameworks
highway overpass build
bridge superstructures
crossing infrastructure
steel transport span
major route construction
urban transit structure
asphalt span erection
trunk route pavement
civil engineering bridge
civil bridge projects
deck renewal project
steel frame bridge build
industrial steel bridge
superstructure erection
welded steel overpass
bridge construction
high load steel span
civil bridge building
span structure construction
viaduct and underpass building
transport bridge structure
transportation passage construction
bridge superstructure renewal
transport bridge construction
roadway crossing construction
overhead and underground crossing construction
transport corridor construction
main logistics road build
primary highway infrastructure
arterial trunk carriageway build
motorway bridge construction
interregional road erection
national route development
lifecycle upgrade of bridge
bridge structural systems
reinforced steel infrastructure
restoration of existing bridge span
modern steel bridge erection
structural crossing infrastructure
bridge rehabilitation construction
steel bridge construction
expressway overpass build
bridge and tunnel construction
structural bridge erection
tunneling and bridging build
bridge superstructure work
structural steel span build
civil crossing facilities
crossing infrastructure build
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :