Closed

SETU Nore Building Ventilation - South East Technological University - Carlow Campus - Nore C135 Ventilation Installation & Associated Works

Descriptions

It is proposed to provide Nore Building C135 with a Heat Recovery Air Handling Unit with integrated heat pump, and a dedicated controller. There are also two offices where it is proposed to install heat recovery units. The unit shall be connected to the existing BMS system to allow the estates department master control of ventilation system. Scope of the mechanical works include the following:- Strip out of existing cold-water storage tanks and pipework etc- Installation of new reduced size cold water storage tank and pipework etc- Replacement of existing polyorc mains water pipework from ground level to tanks, and replacement with copper pipework - Installation of new AHU for lecture theatre- Installation of 2 No. HRU’s for offices - Controls Works- Electrical Works- Builders Works

Timeline

Published Date :

13th Jun 2022 2 years ago

Deadline :

4th Jul 2022 2 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors