Shaftesbury 3G Football pitch

Descriptions

The works comprise of forming new 3G pitch at Shaftesbury Football Club off Coppice Street. Works Description Enabling Works Remove Stand and Dugouts pitch side and replace with new planned seating and dug out area. Excavation & Groundworks Topsoil strip to the entire footprint of the new ATP Load topsoil into HGVs for transporting topsoil off-site to client's own tip arrangements. Perform balanced cut & fill to gain required levels Pitch Sub Base & Kerbs Lay geotextile separation membrane Supply and lay stone sub-base, consisting of minimum 250mm depth of specially selected MOT Type 3 stone, laid by laser paving plant to achieve levels uniformity and planarity no greater than +/-10mm under a 3m straightedge. Install pre-cast concrete perimeter kerbs to the pitch perimeter Supply and install a pre-cast concrete block retaining wall (as required) Supply and lay 40mm depth OGSC macadam to form an engineered base profile to the entire pitch footprint. Finished surface tolerances of the engineered base will achieve levels uniformity and planarity no greater than +/-10mm under a 3m straightedge. 3G Football Turf System Supply and install E-Layer Performance Base insitu poured shockpad to depth of 25mm. Rolled to consolidate and provide structural stability. Supply and lay premium fibre 3G Football Turf, 40mm pile height, comfortably providing FIFA Quality performance. Supply and install permanent white line markings for 1no full size football pitch in accordance with the FIFA regulations Perimeter Fence System Provide a safe and compliant spectator barrier system, 1.2m in height, between the pitch and spectators. Install new large external fence, so that is inside the ground. Stadia Requirements Following the mass increase of use, welfare facilities (Ladies, Gents and Disabled) would need installing. Positioned next to the current garage, ensuring they are easily accessible. Build a suitable storage building to safely house the internal electrical mains incomers, machinery and football equipment. This will replace and improve the current garage area. This should have stadia access and have a concrete base finish. (planning permission required) Reinstatement Works Clearance of construction product related arisings and making good of construction areas. Testing Accredited laboratory testing upon completion of construction works to FIFA Quality, including all necessary administration with FIFA to achieve certification of the pitch prior to the start of the season. Pitch Drainage Design, supply and install pitch drainage system consisting of lateral and perimeter carrier drains designed to ensure the rapid transition of water flows from the pitch profile into a pre-determined outfall. Connect new drainage system into existing drainage outlet on site Supply and install length of Aco drains to collect surface water from hard standing area

Timeline

Published Date :

21st Dec 2020 4 years ago

Deadline :

12th Feb 2021 4 years ago

Contract Start :

13th Apr 2021

Contract End :

9th Jul 2021

Tender Regions

UK

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors