Closed
Site Wide Environmental Monitoring System Replacement Project
Descriptions
Scope The scope of the project is to replace Pirbright's environmental monitoring system, thus ensuring the continuous status of critical temperature dependant facilities and supporting crucial intellectual property in the form of biological material and critical environmental conditions (animal units and insectary). The system must provide a lifespan of a minimum of 15 years from commissioning, to ensure that temperature dependant facilities, and other critical scientific equipment, continues to be adequately monitored. Supporting IT, networking hardware and software across site will also require replacement and upgrade. Ideally the system will be future proofed to accept any changes within Pirbright's future Development Programme. Capability The following areas are covered at present with a total of 364 units, with future expansion of up to 450 units (circa 25% increase) possible: -Plowright building: 199 units. -Jenner building: 50 units. -ISO 11 (10 units), Biggs (22 units), Houghton (14 units) and Brooksby (expected 10 units). -A Block: 9 units, of which 8 units are attributable to the CVIM project. -B Block: 29 units, of which 19 units are attributable to the CVIM project and commercial projects. -Insectary (IS4L): 20 units. -Gatehouse: 1 unit (storage for incoming biological material received out-of-hours used by Science).
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
51210000 - Installation services of measuring equipment
51230000 - Installation services of testing equipment
51110000 - Installation services of electrical equipment
51220000 - Installation services of checking equipment
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors