Skye Iconic Sites Project - Fairy Pools Paths
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
As part of the Skye Iconic Sites Project: to construct new sections of aggregate path, along the old Fairy Pools Main path (approx. 1.3km long, 2m width). Plastic pipe culverts and stone headwalls are a feature of the work, used to replace existing cross drains with the aim of making the path more accessible to visitors. Emphasis will be on achieving the required camber on slopes. In addition new sections of path (approx. 0.3km long, 1.5m to 1.8m width) will lead off from the main path to and from viewpoints popular with visitors. The aggregate will be imported from a Skye quarry. A Helicopter is required to deliver aggregate materials for the upper sections of the project, sections no.3,5 & 6.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45233161 - Footpath construction work
Keywords
curb path build
footpath build
walkway paving works
pavement surfacing
sidewalk construction
pedestrian path erection
public footpath construction
pedestrian walkway installation
walkway network development
sidewalk slab installation
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :