Skye Iconic Sites Project - Fairy Pools Paths

Descriptions

As part of the Skye Iconic Sites Project: to construct new sections of aggregate path, along the old Fairy Pools Main path (approx. 1.3km long, 2m width). Plastic pipe culverts and stone headwalls are a feature of the work, used to replace existing cross drains with the aim of making the path more accessible to visitors. Emphasis will be on achieving the required camber on slopes. In addition new sections of path (approx. 0.3km long, 1.5m to 1.8m width) will lead off from the main path to and from viewpoints popular with visitors. The aggregate will be imported from a Skye quarry. A Helicopter is required to deliver aggregate materials for the upper sections of the project, sections no.3,5 & 6.

Timeline

Published Date :

25th May 2022 3 years ago

Deadline :

22nd Jun 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Keywords

footpath build

pedestrian walkway installation

sidewalk construction

pavement surfacing

pedestrian path erection

walkway paving works

walkway network development

public footpath construction

sidewalk slab installation

curb path build

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

CONTRACT

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors