Awarded
SMP Alliance - Drainage Systems
Descriptions
On behalf of SMP Alliance Partners working with Highways England (Costain Ltd, Balfour Beatty Civil Engineering Ltd, BMJV, Flour Ltd, Jacobs, WSP Ltd) we require the following scope of works: to support the SMP Alliance in the design, development and pre-construction planning of the smart motorway programme with respect to drainage systems, all necessary people, equipment, plant and materials to undertake drainage surveys, all necessary people, equipment, plant and materials for the supply, construction and maintenance of drainage systems as described in GC501 (drainage systems), CD529 (outfalls & culverts), CD530 (soakaways), CD531 (reservoir pavements), CD527 (sumpless gullies), CD534 (chamber tops and gully tops), all necessary people, equipment, plant and materials for the construction and maintenance of the drainage remedial works including where applicable any temporary works design, Removal of existing drainage systems, barriers systems and any other associated works (e.g. site clearance / earthworks) to facilitate installation of drainage systems / remedial works to existing drainage systems. The intent is deploy a regional model aligned to the defined On-Site Assembly Partner regions (North, Midlands & South). Applicants will be able to confirm which regions they wish to apply for, and have the ability to apply for more than one region. The authority will be looking to appoint a minimum of two suppliers per region. Successful applicants will form part of the SMP Alliances overall supplier network, and will be expected to work together in an enterprise model both within the drainage and wider supplier network. MINIMUM STANDARDS As part of this tender exercise, it is a requirement for the Applicant to evidence alignment to the Common Assessment Standard (CAS) above the PAS91:2013 + A1: 2017 standard. This can be achieved via a valid and in date membership with the following assessment bodies; Constructionline (Gold and Platinum Membership), Achilles (Building Confidence Membership), CHAS (Premier Membership) and Builders Profile (upgrade to Constructionline Gold). Lead Applicants who do not hold one of the aforementioned memberships will not be considered for this procurement. Depending on the bidding model proposed by the applicant, any additional Applicant group members will be required to align to the PAS91:2013 + A1: 2017 standard. INDICATIVE TIMELINE Upon release of this notice there will be a 2 week period for potential applicants to register their interest by emailing the Smart Motorways Procurement inbox smpprocurement@highwaysengland.co.uk Tenders will then be issued with a 4 week return period Evaluation and scoring will be carried out within 2 weeks of return date and contract award will then follow. To register interest please email smpprocurement@highwaysengland.co.uk along with your valid in date Constructionline Certificate, Achilles or Common Assessment Standard Audit certification.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
44163112 - Drainage system
43324000 - Drainage equipment
90733500 - Surface water pollution drainage services
45000000 - Construction work
90733800 - Groundwater pollution drainage services
Keywords
drainage pumps
water removal systems
groundwater drainage
field drains
agricultural dewatering
pumping drainage units
drainage system
integrated drain network
engineered drainage assembly
piped drainage infrastructure
construction work
building construction
civil engineering
infrastructure projects
site construction
building sites
structural work
construction services
renovation work
public works
drainage of polluted surface water
contaminated runoff removal
stormwater pollution drainage
sediment-laden water disposal
dewatering polluted sites
surface water drainage planning
aquatic drainage systems
pollutant runoff extraction
drainage infrastructure maintenance
floodwater pollution control
groundwater dewatering services
contaminated well drainage
subsurface drainage of polluted water
aquifer decontamination pumping
landfill leachate drainage
borehole drainage systems
groundwater extraction for pollution control
dewatering contaminated sites
hydrostatic pressure management
soil-water drainage design
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors