Open in a 12 months
SOFT MARKET TESTING - Bedminster Bridges, Redcliffe Hill and Bedminster Parade transport upgrades, including structural refurbishment of two highway bridges
Descriptions
The City Council of Bristol intends to procure approx. £9m civils contract for a major road layout enhancement at Bedminster Bridges and Redcliffe Roundabout in Bristol, which comprises works to all approaches, including extended works on Redcliffe Hill, Redcliffe Way and Bedminster Parade. The works comprise: • Major reconfiguration of the road layout at Bedminster Bridges as per the attached design; the location will no longer operate as a signal controlled roundabout, and traffic will be fully reconfigured as a series of traffic light controlled junctions • Extensive enhancement to Redcliffe roundabout to add traffic signals, cycle tracks, and bus priority • Enhancement and modernisation works to all approaches, especially Redcliffe Hill, Redcliffe Way and Bedminster Parade • Refurbishment and re-waterproofing of 1960s pre-tensioned steel concrete bridge • Refurbishment of 1883 Grade II listed iron bridge • In-fill of 1960s subterranean pedestrian subway • An increased focus on retaining bus punctuality during construction, and minimising disruption to pedestrians and cycles • Realistic measures to follow an accelerated programme, keeping programme duration to a minimum and working outside of normal working hours if this reduces the programme duration (mindful of residential premises nearby, noisy works e.g. hydraulic breaking, must still take place in normal construction hours) • An advanced traffic management set-up during construction to retain traffic co-ordination, using SRL Urban64 or similar system across Bedminster Bridges and Redcliffe roundabout • Liaison and diligent co-ordination with Statutory Undertakers to organise necessary diversionary works • Various landscaping works to new areas with subsequent maintenance, and sensitive work around existing trees in some areas requiring no-dig cycleway construction with use of vacuum excavator as necessary • Plane off and re-surface most roads within the project area, including full carriageway reconstruction and construction in some areas • Extensive areas of footway replacement • Extensive works to electrical assets, including illuminated street furniture and street lights • Stakeholder and public liaison during mobilisation and construction
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors