Closed

SPU CO19-2023 - Turbary GIS Review Blanket bog SACs 2023 0405_SABB23

Descriptions

This RFT is for a desk study to update GIS data, and a number of related tasks as outlined below, on the scale and impact levels of peat-cutting in blanket bog SACs designated to protect blanket bog and associated habitats, in Ireland. This work will inform regulatory system for peat extraction on blanket bogs in such sites. 1.2 Background and Summary of Requirements Increased knowledge on the rate of loss and damage to rare and threatened habitats and species is reflected in legislation to protect these natural resources in particular the EU Habitats, Birds and EIA Directives and the Wildlife Acts (1976) and Amendments (2000). One of these habitats is blanket bog which, according to the survey of Hammond (1979), once covered an estimated 773,860 ha in Ireland and despite, large scale losses, is still our most extensive peatland habitat. Ireland also has particular responsibility for blanket bog as it holds (along with Scotland, Norway and NW Spain) a significant proportion of the global resource and the largest remaining resource of, Atlantic blanket bog, a hyper-oceanic bog type. Ireland is also now the only EU country with lowland blanket bog habitat. Under the EU Habitats Directive 55 Special Areas of Conservation (SACs) have been designated as SAC for the protection of blanket bog.The work entails provision of an update (based on interpretation of recent aerial imagery) of GIS data and site summary reports of 2015 review of blanket bog SACs (Table 1 in RFT) and to apply original review method and update to 5 additional blanket bog SACs (Table 2) and to analyse trends in peat-cutting. A critical review of draft turbary management zoning and overview reports (from earlier review of 10 SACs (Table 4 in RFT) is also required to consider improvements if needed in approach to inform how draft provisional /indicative management zoning should be applied (and to apply this) to remaining SACs (and if needed to update same for those 10 SACs) using imagery review results with key biodiversity data.

Timeline

Published Date :

6th Apr 2023 2 years ago

Deadline :

5th May 2023 2 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

waste management

environmental hygiene

sanitation services

refuse collection

sewage management

environmental cleaning

public sanitation

waste disposal

ecological services

urban cleaning

environmental management

pollution control

ecological assessment

sustainability services

habitat restoration

environmental protection

ecosystem monitoring

eco-consulting

natural resource care

green services

environmental planning

ecological governance

environmental policy implementation

regulatory compliance

environmental auditing

green strategy

environmental oversight

eco-administration

sustainable management

environmental coordination

EIA services

ecological impact studies

environmental risk analysis

biodiversity assessment

habitat impact review

impact statement preparation

sustainability evaluation

environmental screening

non-construction EIAs

ecological assessment reports

eco-standards development

environmental regulation guidance

compliance benchmarking

non-construction environmental criteria

regulatory thresholds setting

environmental norms consultation

sustainability standards

eco-compliance service

standard implementation

environmental threshold analysis

air and water quality monitoring

ecological surveillance

biodiversity monitoring

non-construction environmental sampling

soil testing programs

ecosystem health monitoring

environmental trend analysis

field data collection

compliance monitoring

pollutant tracking

ecological land-use design

natural resource zoning

environmental strategy development

sustainable infrastructure planning

habitat preservation planning

ecological impact planning

green space design

environmental policy mapping

ecosystem management planning

eco compliance audits

sustainability performance review

environmental risk assessment

green certification audits

regulatory environmental audits

eco-inspection services

sustainability auditing

emissions audit

environmental KPI reviews

specific activity environmental audits

project-level eco-assessment

on-site environmental audits

waste handling audit

water usage audit

greenhouse gas audit

biological hazard audit

construction activity audit

mobility audit

energy usage audit

ecological preservation

biodiversity conservation

natural resource defense

environmental safeguarding

habitat protection

emission mitigation

sustainability enforcement

eco-regulation services

conservation compliance

ecosystem restoration

contaminated site cleanup

land reclamation

habitat re-establishment

degraded area recovery

wetland rehabilitation

ecological disturbance repair

reclamation planning

environmental renewal

eco-restoration services

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors