Open Closing in a 27 days
Stratford Park Lake road runoff diversion project
Descriptions
The design and build of a new pipe (approximately 90m in length) to connect the existing highway drainage network to the Painswick Stream. The oil interceptors will be kept, the new pipe will connect the outlet from the oil interceptor to a new outfall into the Painswick Stream (aligning with the conditions set out in FRA12 of the environmental permitting regulations) and making good all damaged ground. Please see the Project brief for further information and specification.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45111240 - Ground-drainage work
Keywords
ground-drainage work
site drainage
trench drainage
dewatering
stormwater management
drainage channels
ground water control
subsoil drainage
pipe drainage
site water control
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors