Closed
Supply and Installation of Four Post Lift in Northern France
Descriptions
This requirement if for the supply and installation of a Bradbury H4443 wheel free 4 post lift. This is a specific model that is required so that it will fit within the existing footprint and work space. The lift will be required to be supplied and installed within the Channel Tunnel site in Coquelles, France. Before installation, the existing Bradbury 40 series 4 post lift will need dismantling/ uninstalling. All quotes are requested include and itemise: - Cost of all goods and services relating to the delivery, supply and install of the 4 post lift; - All labour costs in relation to the above; - All travel and subsistence costs. The quote is not required to include: - The costs of an electrical engineer to connect the lift to the mains power supply; - The supply a of forklift truck; Both of the above requirements are expected to be provided by the port operator. Please provide a clear indication of lead times and timescales within your quotation.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
42000000 - Industrial machinery
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors