Closed
Supply Chain Notice: BLD0366-01 Ship Hall Mega Doors
Descriptions
Survey, Design & Installation of Ship Hall Mega Doors Building 1/122 Ship Hall B was built in 2003. The north elevation has a large opening (circa 47.1 m x 32.3 m) completed by two vertical lift fabric doors, separated by a removeable central mullion. Both doors and mullion are in a poor material condition after 20 years, and the right-hand door (viewed from external) was damaged during a storm in November 2024. The aim of this project is to replace the doors and associated equipment. The contractor shall develop a fully detailed and construction-ready design package that includes technical drawings, installation methodologies, and a comprehensive compliance plan to ensure all regulatory requirements are met. The design shall demonstrate a clear path for commissioning, testing, and integration with other systems.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45213221 - Warehouse stores construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors