Closed
T23 Power Generation and MCAS Update (PGMU) — Systems Integration.
Descriptions
Draft plans (systems and integration). Software integration consultancy services. Hardware integration consultancy services. The PGMU SI would be responsible for: the intra-PGMU functional and physical integration; the provision of timely and accurate PGMU system-to-platform interface data to enable the development of the Installation Solution; the coordination of system-level transversal aspects including safety, environment, security, Electromagnetic Compatibility and Electromagnetic Fields; participating in the Integrated Test, Evaluation and Acceptance (ITEA) process and conducting/overseeing system-level test events that firstly provide an acceptable level of confidence in the PGMU system solution pre-installation, and secondly deliver evidence against the SRD and URD requirements post-installation; the management of a coherent training system. Equipment from Lots 1-4 would be installed during deep maintenance periods of the T23 Frigates by the Original Equipment Manufacturers and the nominated dockyard Contractor under the Surface Ship Support Alliance (SSSA) agreement.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71243000 - Draft plans (systems and integration)
72228000 - Hardware integration consultancy services
72227000 - Software integration consultancy services
Keywords
system integration design
draft layout planning
preliminary system design
integration blueprint services
system architecture draft
preliminary design consulting
system design sketches
integration planning
concept integration design
schematic planning
integration architecture design
cross-platform interface planning
middleware advisory services
API orchestration strategies
system handshake protocol design
legacy system compatibility consulting
data exchange model alignment
service layer integration mapping
hardware-software interfacing strategy
peripheral configuration consulting
embedded systems linkage
firmware integration plans
controller interface mapping
device communication protocols
sensor-actuator coordination
physical systems synchronization
system bus configuration
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors