Closed
Technology Development Centre
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Offshore Renewable Energy ("ORE") Catapult has a requirement to build a Technology Development Centre ("TDC") and to do so, it needs to refurbish an existing storage building at our site in Blyth, Northumberland, which is approximately 1800m2 in floorspace. The aspiration for the refurbished building and the new office space is for it to both reflect and inspire the innovative and renewable energy creative nature of the business. ORE Catapult require the fabric of the building to be refurbished and to create a two (2) story office space within the building. Whilst it is ORE Catapults preferred solution to have one (1) main contractor to deliver a turnkey solution, as all work needs to be completed ready for the occupation of the building by Monday 08 June 2023, the tender has been broken into several Lots to reflect the nature of the various industries likely to bid. However, all contractors are expected to work seamlessly with the main Lot 1 Contractor to ensure the deadline of 08 June 2023 is achieved. Suppliers may apply for one or more of the following Lots. Lot 1Refurbishment of the building currently known as Shed D, this will include the provision of lab and furnished office space within the building; £2.6m Lot 2Installation of 11kV electrical supply with associated transformer compound with switch gear;£700k Lot 2 (optional)Supply and installation of electrical infrastructure to support the Mini-eGrid project. £110k Lot 3Provision of external weather proofing to the 6MW Pitch bearing test rig; £350k Critically, the total budget available for this entire project, but the funding available for each Lot stated above is a guide only, as where we can make savings to any one Lot it will allow more funds to be released into other Lots, if proved necessary. A bidder conference and site visit has been arranged for Tuesday 16 November 2022 at 1400 hrs. Tenderers are strongly advised to attend. Those tenderers wishing to attend are to register their interest by completing the Appendix 7 Site Visit Attendance Form and submitting by email to procurement@ore.catapult.org.uk no later than Friday 11th November 2022. Due to capacity issues on site, we require a maximum of two (2) people from each company attend, but virtual attendance can be arranged.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45310000 - Electrical installation work
45350000 - Mechanical installations
45000000 - Construction work
31170000 - Transformers
Keywords
furniture
building wiring
public works
building sites
structural work
renovation work
office equipment
home furnishings
cable routing
mechanical system setup
site construction
circuit installation
internal power grid
interior fittings
infrastructure projects
voltage transformer
domestic appliances
construction work
electrical transformer
lighting and power setup
construction services
civil engineering
machinery mounting
non-lighting appliances
distribution transformer
cleaning supplies
power transformer
building construction
industrial transformer
electrical installation
household products
sanitary fittings
plant equipment installation
electrical infrastructure
electrical connection works
electrical network installation
mechanical installation work
electrical systems fitting
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :