Awarded

Technology Hub Building Project.

Descriptions

The project comprises the construction of a new Technology Hub, attached to the rear of the existing 3-storeyLevens Building. The Technology Hub will comprise a 3 storey new build building of circa 2 850 m2, comprisingcirca 20 classrooms, a lecture theatre, offices and associated ancillary facilities.The contractor for the Works will undertake the demolition of the existing single storey building to the rear ofhe existing Levens Building (the 3 storey Levens building to be retained), services diversions / terminationsas required, reduced level dig and construction of substructure / foundation / slab works and the constructionof the shell and fit out elements of the building. These packages will include external walls, masonry, structuralframe, wall systems and contractor designed cladding systems, contractor designed window and curtain wallingsystems, contractor designed roof systems, upper floors and stairs construction, screeds, internal fit-out of thebuilding, construction of internal partitioning and screens, floor, wall and ceiling finishes and decorations, joinery,contractor designed mechanical and electrical installations, a replacement lift installation, and installation offixed furniture and equipment.In addition to the above construction works, the contractor will also be required to undertake the external works.This will comprise hard and soft landscaping, surface and foul water drainage systems and external servicesinfrastructure. This will be described in detail in the tender information.The contractor will also be required to undertake a full contractor designed mechanical and electrical installationwhich will include a highly sustainable design with use of low energy components and renewable technologyand likely to incorporate solar thermal, PV and CHP components, low energy systems and a wet heatingsystem. The building will be highly insulated with high performance windows and built to a sustainable standard.The project will potentially be required to meet the requirements of a BREEAM Excellent rating.The project is to be designed by the Client's appointed design team. The form of contract will be a JCT StandardBuilding Contract with Quantities (2011). The design team will not be novated to the Principal Contractor.

Timeline

Published Date :

12th Mar 2016 9 years ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

masonry

earthmoving

general building

land clearing

LPG system setup

turnkey projects

foundation prep

domestic wiring

excavation work

wrecking work

building wiring

public works

new buildings

boiler mounting

demolition prep

internal cabling

panel mounting

building sites

circuit cabling

structural work

infrastructure

plumbing work

plastering work

pipe fittings

MEP works

site preparation

earthworks

insulation work

renovation work

terminal fitting

conduit laying

mains wiring

cable routing

ductwork fitting

excavation

site grading

finishing trades

superstructure

site leveling

heavy earthwork

painting work

AC unit fitting

site clearing

glass fitting

noise-reduction paneling

power supply setup

building projects

energy loss reduction

residential construction

evacuation alert system

window glazing fitting

toilet/basin fitting

groundwork services

boiler installation

mechanical system setup

site preparation work

site construction

woodwork installation

cosmetic renovation

gas appliance fitting

circuit installation

heating circuit setup

final touch trades

internal power grid

architectural building

domestic gas meter mount

power outlet integration

wall smoothing plaster

building overhaul

general contracting

lighting circuit works

plasterboard works

wall lining fitting

HVAC ventilation setup

electrical wiring

sanitary installation

fixture integration

render application

infrastructure projects

structural wood fitting

bathroom fixture fit-out

building installation

heat barrier fitting

drainage system assembly

boiler pipe connection

interior painting

technical fit-out

building demolition work

glazing installation

construction work

structural construction

wiring infrastructure

lighting and power setup

heat sensor wiring

shell construction

gas fitting installation

refurbishment work

construction services

civil engineering

service integration

smoke detector fitting

sound insulation work

engineering construction

structural refurbishment

systems installation

cable installation

split system AC mount

preparatory works

power system wiring

gas meter fitting

building completion work

electrical fittings

power cable installation

machinery mounting

building dismantling

general engineering work

luminaire installation

structural demolition

fire-alarm installation

demolition services

gas meter installation

boiler room setup

final construction stage

gypsum finish work

thermal insulation work

building construction

building erection

carpentry fitting

device installation

electrical installation

internal wiring network

conduit installation

gypsum board assembly

drywall installation

boiler system fit-out

soundproofing fit-out

kitchen gas line fitting

completion civils

fire safety network

domestic wiring layout

switchboard fitting

airflow infrastructure build

integrated engineering works

light fixture installation

technical construction services

plant equipment installation

electrical infrastructure

electrical connection works

electrical accessories fitting

interior and exterior finishing

central-heating system installation

HVAC cooling system setup

automatic fire signal system

gas usage measuring device installation

completion of interiors/exteriors

comprehensive construction works

electrical network installation

acoustic barrier installation

sanitary ware installation

commercial fit-out electrics

heat-retention barrier install

temperature-control insulation

floor and wall covering work

climate control system installation

mechanical installation work

joinery installation work

interior infrastructure install

surface finish installation

electrical systems fitting

insulating materials fitting

electrical connection setup

radiator pipework assembly

domestic gas pipework installation

ducted air-conditioning install

alarm control panel fitting

electrical wiring and fittings

structural and civil works

interior system installation

building handover preparation

flooring and wall surfacing

pipeline meter installation

indoor air circulation installation

natural gas equipment install

structured wiring installation

interior/exterior renewal

mechanical ventilation fitting

interior surface finishing

commercial building works

thermal insulation installation

building envelope insulation

air exchange system install

gas safety valve installation

partition wall construction

switch and socket mounting

sanitary fixture installation

air-conditioning installation

construction finish works

civil-structural engineering

building service deployment

emergency alarm installation

building fire alarm works

civil engineering project work

infrastructure and structures build

decorative surface coating

ventilation equipment installation

fire detection system setup

multidisciplinary engineering build

WC and urinal installation

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk