Awarded
Technology Hub Building Project.
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The project comprises the construction of a new Technology Hub, attached to the rear of the existing 3-storeyLevens Building. The Technology Hub will comprise a 3 storey new build building of circa 2 850 m2, comprisingcirca 20 classrooms, a lecture theatre, offices and associated ancillary facilities.The contractor for the Works will undertake the demolition of the existing single storey building to the rear ofhe existing Levens Building (the 3 storey Levens building to be retained), services diversions / terminationsas required, reduced level dig and construction of substructure / foundation / slab works and the constructionof the shell and fit out elements of the building. These packages will include external walls, masonry, structuralframe, wall systems and contractor designed cladding systems, contractor designed window and curtain wallingsystems, contractor designed roof systems, upper floors and stairs construction, screeds, internal fit-out of thebuilding, construction of internal partitioning and screens, floor, wall and ceiling finishes and decorations, joinery,contractor designed mechanical and electrical installations, a replacement lift installation, and installation offixed furniture and equipment.In addition to the above construction works, the contractor will also be required to undertake the external works.This will comprise hard and soft landscaping, surface and foul water drainage systems and external servicesinfrastructure. This will be described in detail in the tender information.The contractor will also be required to undertake a full contractor designed mechanical and electrical installationwhich will include a highly sustainable design with use of low energy components and renewable technologyand likely to incorporate solar thermal, PV and CHP components, low energy systems and a wet heatingsystem. The building will be highly insulated with high performance windows and built to a sustainable standard.The project will potentially be required to meet the requirements of a BREEAM Excellent rating.The project is to be designed by the Client's appointed design team. The form of contract will be a JCT StandardBuilding Contract with Quantities (2011). The design team will not be novated to the Principal Contractor.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45453100 - Refurbishment work
45311100 - Electrical wiring work
45321000 - Thermal insulation work
45100000 - Site preparation work
45210000 - Building construction work
45331110 - Boiler installation work
45450000 - Other building completion work
45200000 - Works for complete or part construction and civil engineering work
45311200 - Electrical fitting work
45324000 - Plasterboard works
45330000 - Plumbing and sanitary works
45400000 - Building completion work
45333200 - Gas meter installation work
45333000 - Gas-fitting installation work
45220000 - Engineering works and construction works
45440000 - Painting and glazing work
45310000 - Electrical installation work
45110000 - Building demolition and wrecking work and earthmoving work
45331100 - Central-heating installation work
45300000 - Building installation work
45430000 - Floor and wall covering work
45350000 - Mechanical installations
45420000 - Joinery and carpentry installation work
45410000 - Plastering work
45331210 - Ventilation installation work
45332400 - Sanitary fixture installation work
45000000 - Construction work
45312100 - Fire-alarm system installation work
45320000 - Insulation work
45311000 - Electrical wiring and fitting work
45323000 - Sound insulation work
45331220 - Air-conditioning installation work
Keywords
masonry
earthmoving
general building
land clearing
LPG system setup
turnkey projects
foundation prep
domestic wiring
excavation work
wrecking work
building wiring
public works
new buildings
boiler mounting
demolition prep
internal cabling
panel mounting
building sites
circuit cabling
structural work
infrastructure
plumbing work
plastering work
pipe fittings
MEP works
site preparation
earthworks
insulation work
renovation work
terminal fitting
conduit laying
mains wiring
cable routing
ductwork fitting
excavation
site grading
finishing trades
superstructure
site leveling
heavy earthwork
painting work
AC unit fitting
site clearing
glass fitting
noise-reduction paneling
power supply setup
building projects
energy loss reduction
residential construction
evacuation alert system
window glazing fitting
toilet/basin fitting
groundwork services
boiler installation
mechanical system setup
site preparation work
site construction
woodwork installation
cosmetic renovation
gas appliance fitting
circuit installation
heating circuit setup
final touch trades
internal power grid
architectural building
domestic gas meter mount
power outlet integration
wall smoothing plaster
building overhaul
general contracting
lighting circuit works
plasterboard works
wall lining fitting
HVAC ventilation setup
electrical wiring
sanitary installation
fixture integration
render application
infrastructure projects
structural wood fitting
bathroom fixture fit-out
building installation
heat barrier fitting
drainage system assembly
boiler pipe connection
interior painting
technical fit-out
building demolition work
glazing installation
construction work
structural construction
wiring infrastructure
lighting and power setup
heat sensor wiring
shell construction
gas fitting installation
refurbishment work
construction services
civil engineering
service integration
smoke detector fitting
sound insulation work
engineering construction
structural refurbishment
systems installation
cable installation
split system AC mount
preparatory works
power system wiring
gas meter fitting
building completion work
electrical fittings
power cable installation
machinery mounting
building dismantling
general engineering work
luminaire installation
structural demolition
fire-alarm installation
demolition services
gas meter installation
boiler room setup
final construction stage
gypsum finish work
thermal insulation work
building construction
building erection
carpentry fitting
device installation
electrical installation
internal wiring network
conduit installation
gypsum board assembly
drywall installation
boiler system fit-out
soundproofing fit-out
kitchen gas line fitting
completion civils
fire safety network
domestic wiring layout
switchboard fitting
airflow infrastructure build
integrated engineering works
light fixture installation
technical construction services
plant equipment installation
electrical infrastructure
electrical connection works
electrical accessories fitting
interior and exterior finishing
central-heating system installation
HVAC cooling system setup
automatic fire signal system
gas usage measuring device installation
completion of interiors/exteriors
comprehensive construction works
electrical network installation
acoustic barrier installation
sanitary ware installation
commercial fit-out electrics
heat-retention barrier install
temperature-control insulation
floor and wall covering work
climate control system installation
mechanical installation work
joinery installation work
interior infrastructure install
surface finish installation
electrical systems fitting
insulating materials fitting
electrical connection setup
radiator pipework assembly
domestic gas pipework installation
ducted air-conditioning install
alarm control panel fitting
electrical wiring and fittings
structural and civil works
interior system installation
building handover preparation
flooring and wall surfacing
pipeline meter installation
indoor air circulation installation
natural gas equipment install
structured wiring installation
interior/exterior renewal
mechanical ventilation fitting
interior surface finishing
commercial building works
thermal insulation installation
building envelope insulation
air exchange system install
gas safety valve installation
partition wall construction
switch and socket mounting
sanitary fixture installation
air-conditioning installation
construction finish works
civil-structural engineering
building service deployment
emergency alarm installation
building fire alarm works
civil engineering project work
infrastructure and structures build
decorative surface coating
ventilation equipment installation
fire detection system setup
multidisciplinary engineering build
WC and urinal installation
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :