Closed

Technology Hub Building Project.

Descriptions

The project comprises the construction of a new Technology Hub, attached to the rear of the existing 3 storey Levens Building. The Technology Hub will comprise a 3 storey new build building of circa 2 850 m2, comprising circa 20 classrooms, a lecture theatre, offices and associated ancillary facilities.The contractor for the Works will undertake the demolition of the existing single storey building to the rear of the existing Levens Building (the 3 storey Levens building to be retained), services diversions / terminations as required, reduced level dig and construction of substructure / foundation / slab works and the construction of the shell and fit out elements of the building. These packages will include external walls, masonry, structural frame, wall systems and contractor designed cladding systems, contractor designed window and curtain walling systems, contractor designed roof systems, upper floors and stairs construction, screeds, internal fit-out of the building, construction of internal partitioning and screens, floor, wall and ceiling finishes and decorations, joinery, contractor designed mechanical and electrical installations, a replacement lift installation, and installation of fixed furniture and equipment.In addition to the above construction works, the contractor will also be required to undertake the external works. This will comprise hard and soft landscaping, surface and foul water drainage systems and external services infrastructure. This will be described in detail in the tender information.The contractor will also be required to undertake a full contractor designed mechanical and electrical installation which will include a highly sustainable design with use of low energy components and renewable technology and likely to incorporate solar thermal, PV and CHP components, low energy systems and a wet heating system. The building will be highly insulated with high performance windows and built to a sustainable standard. The project will potentially be required to meet the requirements of a BREEAM Excellent rating.The University may separately procure some furniture and fittings and specialist technical fit out works which will be installed during the works. The University may require access for artists and tradesmen to various areas of the building. This will be described in detail in the tender information.The project is to be designed by the Client's appointed design team. The form of contract will be a JCT Standard Building Contract with Quantities (2011). The design team will not be novated to the Principal Contractor. Further information will be provided in the Invitation to Tender.

Timeline

Published Date :

5th Nov 2015 10 years ago

Deadline :

3rd Dec 2015 10 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

masonry

earthmoving

general building

land clearing

LPG system setup

foundation prep

domestic wiring

excavation work

wrecking work

building wiring

public works

new buildings

boiler mounting

demolition prep

internal cabling

panel mounting

building sites

circuit cabling

structural work

plumbing work

plastering work

pipe fittings

MEP works

site preparation

earthworks

insulation work

renovation work

terminal fitting

conduit laying

mains wiring

cable routing

ductwork fitting

excavation

site grading

finishing trades

superstructure

site leveling

heavy earthwork

painting work

site clearing

glass fitting

noise-reduction paneling

power supply setup

energy loss reduction

residential construction

ventilation duct setup

window glazing fitting

toilet/basin fitting

groundwork services

boiler installation

mechanical system setup

site preparation work

site construction

woodwork installation

gas appliance fitting

circuit installation

heating circuit setup

final touch trades

internal power grid

architectural building

heating system fit-out

power outlet integration

domestic gas meter mount

wall smoothing plaster

lighting circuit works

plasterboard works

wall lining fitting

HVAC ventilation setup

electrical wiring

sanitary installation

fixture integration

HVAC installation

render application

infrastructure projects

structural wood fitting

bathroom fixture fit-out

building installation

heat barrier fitting

drainage system assembly

boiler pipe connection

interior painting

technical fit-out

building demolition work

glazing installation

construction work

structural construction

wiring infrastructure

lighting and power setup

shell construction

gas fitting installation

construction services

civil engineering

service integration

sound insulation work

engineering construction

water plumbing work

systems installation

cable installation

gas meter fitting

preparatory works

power system wiring

building completion work

electrical fittings

power cable installation

machinery mounting

building dismantling

general engineering work

water supply plumbing

luminaire installation

structural demolition

demolition services

gas meter installation

boiler room setup

final construction stage

gypsum finish work

thermal insulation work

building construction

building erection

carpentry fitting

device installation

electrical installation

internal wiring network

conduit installation

gypsum board assembly

drywall installation

boiler system fit-out

soundproofing fit-out

kitchen gas line fitting

completion civils

domestic wiring layout

switchboard fitting

airflow infrastructure build

integrated engineering works

light fixture installation

technical construction services

plant equipment installation

electrical infrastructure

electrical connection works

main water line installation

process equipment fitting

electrical accessories fitting

interior and exterior finishing

central-heating system installation

gas usage measuring device installation

completion of interiors/exteriors

comprehensive construction works

electrical network installation

acoustic barrier installation

sanitary ware installation

commercial fit-out electrics

heat-retention barrier install

temperature-control insulation

floor and wall covering work

mechanical installation work

joinery installation work

interior infrastructure install

surface finish installation

electrical systems fitting

insulating materials fitting

electrical connection setup

radiator pipework assembly

domestic gas pipework installation

heavy machinery integration

electrical wiring and fittings

structural and civil works

interior system installation

building handover preparation

flooring and wall surfacing

pipeline meter installation

indoor air circulation installation

mechanical engineering installation

natural gas equipment install

structured wiring installation

mechanical ventilation fitting

interior surface finishing

commercial building works

thermal insulation installation

building envelope insulation

air exchange system install

gas safety valve installation

partition wall construction

precision plant installation

switch and socket mounting

sanitary fixture installation

construction finish works

potable water pipe installation

civil-structural engineering

building service deployment

clean water system fit-out

civil engineering project work

infrastructure and structures build

decorative surface coating

air-conditioning system installation

ventilation equipment installation

multidisciplinary engineering build

WC and urinal installation

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk