Closed
Terminal Buildings: Piling and Substructure
Descriptions
The physical scope of this work includes the design and build of Piling and Substructure works for the Western Energy Centre, Main Terminal and Terminal Extensions (the Piling and Deck package already procured will provide the foundations for the major part of East Terminal Extension, the New East Pier and the Eastern Energy Centre).Piling works includes:— CFA piling (varying diameter, mainly between 300-600 mm with a number of 1200 mm) with pile caps,— holding down bolts.Substructure includes:— ground beams,— lift, escalator and service Pits,— basements (secant piles and walls),— ground slabs and precast planks,— existing concrete deck demolition and reconstruction.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
Wales
CPV Codes
45262210 - Foundation work.
Tenderbase Categories
Building Materials/Structures/ Road Construction Materials/ Building Fittings/ Wood Materials /Doors and Windows/Rods and Bars/ Stone for Construction
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Tender Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors