Awarded

Thames Tideway Tunnel Project — Main Works — Category 1, C405 Thames Tideway Tunnel — Main Works — W

Descriptions

Although this procurement was commenced and conducted by Thames Water Utilities Limited (TWUL), the contract is entered into by the successful Infrastructure Provider, Bazalgette Tunnel Limited, pursuant to the procedure set out in Section VI.3) of that contract notice. The Infrastructure Provider is a body designated by the Secretary of State for the Environment, Food and Rural Affairs or by Ofwat (the Water Services Regulation Authority) (as the case may be) in respect of the Project or part(s) of the Project under or by virtue of Section 36D of the Water Industry Act 1991 (as inserted by Section 35 of the Flood and Water Management Act 2010) and pursuant to the Water Industry (specified Infrastructure Projects) (English undertakers) Regulations 2013 (SI 2013/1582).The works and services to be provided pursuant to the Contract(s) will be undertaking in London, UK across circa 21 sites from Acton in the West to Abbey Mills in the East, along and underneath the River Thames and connecting with Lee Tunnel (currently under construction). The Contract(s) are for the design, construction, commissioning and (during the caretaker period) maintenance of the Thames Tideway Tunnel and are separated into 3 Lots (3 separate Contracts) as follows:— Main Works — West — main tunnel drive including shafts and connections — Carnwath Road Riverside to Acton Storm Water Tanks and long connection tunnel drive — Frogmore;— Main Works — Central — mail tunnel drives including shafts and connections — Kirtling Street to Carnwath Road Riverside (West) and Kirtling Street to Chambers Wharf (East); and— Main Works — East — main tunnel drive including shafts and connections — Chambers Wharf to Abbey Mills Pumping Station and long connection tunnel drive — Greenwich Pumping Station t Chambers Wharf.The London Tideways Improvements (of which the Thames Tideway Tunnel and the Lee Tunnel form a part) will modernise London's sewerage system, delivering environmental and economic benefits to the UK's capital for generations. The Thames Tideway Tunnel is a major new sewer to be designed and constructed to help manage the problem of untreated sewage overflowing from the capital's sewers via combined sewer overflows (CSOs) and is intended (once constructed) to enable the UK to meet the requirements of the Urban Waste Water Treatment Directive when operated in conjunction with the Lee Tunnel.The Thames Tideway Tunnel Project (the Project) comprises:— wastewater sewers and tunnels;— design, construction, commissioning, operation, financing and maintenance of the main tunnel and connection tunnels;— CSO drop shafts, short connection tunnels and associated development to intercept flows and divert them into the main tunnel or connection tunnels;— works to modify Thames Water's existing pumping stations and sewers;— associated development to facilitate construction of the tunnels and shafts; and— such other works and/or services as are necessary to deliver Thames Tideway Tunnel Project.The 6,5-7,2 m-diameter, 25 km-long main tunnel between Thames Water's existing operational sites at Acton Storm Tanks and Abbey Mills Pumping Station will control untreated sewage from 34 CSOs identified as ‘unsatisfactory’ by the Environment Agency. Sewage flows captured in the Thames Tideway Tunnel are intended to be transferred down the Thames Tideway Tunnel route for pumping out and treatment at Beckton Sewage Treatment Works via the Lee Tunnel. The long connection tunnels are known as the Frogmore connection tunnel (2,6 m-diameter and 1,1 km-long) and the Greenwich connection tunnel (5 m-diameter and 4,6 km-long) (measurements are approximate). Contractors will be required to design, build and/or procure Equipment including tunnel boring machines (TBMs) and diaphragm walling equipment to construct the relevant sections of the Thames Tideway Tunnel. Applicants should note that the Thames Tideway Tunnel will pass under existing infrastructure, including bridges, transport and utility tunnels, in-river structures, river walls and buildings and protective measures will need to be taken into consideration when designing and implementing the works.Key objectives for the delivery of the Thames Tideway Tunnel include ensuring highest quality construction, current best practice with regards to the safety regime and full consideration for whole life maintenance costs in selection of materials and constructions techniques.

Timeline

Published Date :

28th Oct 2015 9 years ago

Deadline :

N/A

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

marine equipment

ship equipment

maritime gear

vessel equipment

marine hardware

boat fittings

nautical apparatus

sea equipment

marine accessories

ship supplies

tunnel boring machines

TBMs

trenchers

underground excavation machines

mining tunnellers

construction plant machinery

heavy-duty equipment

building site machinery

construction vehicles

civil works equipment

earthmoving construction tools

construction work

building construction

civil engineering

infrastructure projects

site construction

building sites

structural work

construction services

renovation work

public works

tunnel construction

shaft excavation work

subway build

underground passage construction

sub-surface civil works

tunnel and shaft engineering

metro infrastructure build

subterranean civil work

tunnel boring projects

underground transit tunnel build :contentReference[oaicite:1]{index=1}

underground passage build

civil tunnel engineering

bore construction

tunnel excavation

sub-surface structure build

road/rail tunnel work

cross-mountain tunneling

subterranean transit work

civil buried structure

under-river tunnel construction

riverbed tunnel build

subaqueous tunnel erection

watercourse tunnel construction

submerged tunnel work

tunnel under river

crossing beneath riverbed

hydrological subsurface passage

sub-river transit tunnel

river tunnel engineering

tunnelling works

tunnel boring

underground drive construction

TBM tunnelling

tunnel excavation works

rock-boring for tunnels

subterrain tunnel work

tunnel shafting

civil tunnelling project

tunnel lining work

tunnel lining construction

internal tunnel finish

concrete tunnel lining

waterproof tunnel coating

tunnel interior structure

reinforced lining erection

shotcrete tunnel lining

structural lining work

tunnel façade installation

lining system build

water pipeline installation

sewage conduit construction

wastewater main laying

sanitary sewer build

drainage pipeline works

utility water line build

sewage disposal conduit

fluid transport pipelaying

sewage infrastructure erection

water network pipeline work

sewerage network construction

wastewater pipeline build

sanitary sewer installation

underground sewer trenching

municipal drain build

stormwater/sewer conduit work

sewage main laying

combined sewer system build

wastewater disposal pipeline works

sub-surface sewer installation

sewerage infrastructure works

sewage network construction

waste & storm sewer build

sewer pipeline installation

municipal sewer works

sanitary drainage network build

sewerage civil works

pipeline trenching for sewerage

sewer system erection

wastewater line build

sewage pipe build

sewer conduit installation

sub-surface sewage pipework

sewer line construction

drainage pipe erection

municipal sewage pipe installation

underground sewer conduit build

sewer main pipeline works

sanitation pipe construction

sewer network pipework

water infrastructure construction

hydraulic civil engineering

waterworks build

dam and reservoir works

canal construction

irrigation infrastructure

water reticulation civils

hydraulic structure build

marine water project works

freshwater engineering

flood-prevention works

storm surge barrier installation

anti-flood infrastructure

levee system build

floodgate construction

overflow management works

water containment projects

river flood control

drainage prevention systems

flood defence engineering :contentReference[oaicite:8]{index=8}

wastewater-treatment plant construction

effluent treatment facility

sewage purification station build

greywater processing works

wastewater reclamation plant

biological treatment infrastructure

urban wastewater works

building construction support

site utilities installation

earthworks services

structural framework setup

modular construction support

access infrastructure services

pre-construction services

temporary facilities setup

construction logistics

utilities trenching

waterproofing services

noise control implementation

heavy equipment operation

scaffold planning

site clearing services

sewer operation

wastewater handling

sewage network management

effluent transport

urban sewage services

sewerage operation

wastewater logistics

sewage pipeline services

sewer network care

sewage dispatch

vessel support operations

maritime logistics

port diving work

berth maintenance services

underwater hull inspections

port towage coordination

harbor equipment handling

sea transport assistance

dockside servicing

marine facility upkeep

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors