Closed
The Installation of New Domestic Gas Heating Systems and System Upgrades
Descriptions
The London Borough of Hillingdon (Hillingdon) currently manages and maintains the domestic gas installations of approximately 9,000 tenanted Council properties. Hillingdon proposes to award a new contract to a single contractor to deliver the Council's requirement of new gas installations and system upgrades to its domestic stock. This may include renewable and combined heat and power installations, heat interface units and Liquefied Petroleum Gas (LPG) installations. The London Borough of Hillingdon is planning on replacing approximately 200 boilers a year that will be issued on a reactive basis. London Borough of Hillingdon does not provide any guarantees or assurances in respect of the annual value or volumes of work which will be procured under this proposed contract. The Council intends to award a contract for these services for a period of up to four years with an option to extend for up to a further 1 +1 years subject to agreement and satisfactory performance.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
44621110 - Central-heating radiators
44600000 - Tanks, reservoirs and containers; central-heating radiators and boilers
44621000 - Radiators and boilers
50531100 - Repair and maintenance services of boilers
39715210 - Central-heating equipment
50721000 - Commissioning of heating installations
45331100 - Central-heating installation work
44621220 - Central-heating boilers
44115200 - Plumbing and heating materials
44620000 - Central-heating radiators and boilers and parts
42160000 - Boiler installations
Keywords
central‑heating equipment
boiler peripherals
radiator components
HVAC central systems
boiler installation
steam boiler unit
industrial boiler plant
boiler equipment
boiler mounting
boiler house
steam generation system
process boiler
heating boiler installation
boiler assembly
plumbing and heating materials
pipe fittings
valves
radiators
sanitary systems
HVAC supplies
tanks
reservoirs
containers
pressure vessels
water tanks
storage tanks
boilers
boiler units
central‑heating systems
central-heating radiators
radiator parts
heat exchangers
bimetallic radiators
heating elements
boiler components
cast iron radiators
steel radiators
radiator valves
heating radiators
industrial boilers
domestic radiators
steam boilers
central heating systems
radiator panels
boiler vessels
radiator units
home radiators
household radiators
residential radiators
panel heating units
column heaters
hydronic radiators
boiler radiators
room radiators
central-heating boilers
hydronic boilers
high-efficiency boilers
combi boilers
condensing boilers
residential boilers
industrial boiler units
boiler systems
central-heating system installation
boiler system fit-out
radiator pipework assembly
heating circuit setup
boiler pressure test
firetube cleaning
burner calibration
safety valve replacement
boiler gasket renewal
boiler shell inspection
heat exchanger servicing
steam line repair
burner control check
boiler tube retubing
boiler startup calibration
heat load balancing
system pressure testing
thermostat commissioning
burner tuning
safety interlock test
system documentation handover
fuel efficiency validation
heating zone activation
commissioning report issuance
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors