Closed
The Procurement of a Dust Control System for Tees Dock Warehouse A
Descriptions
The requirement is to design, manufacture, deliver, install, test and complete a dust dilution ventilation system for bays 1, 2 and 3 of Tees Dock Warehouse A. The dust dilution ventilation system shall consist of 3 separate systems (one for each bay). Each bay being 33m wide x 90m long x 14m apex (38,000m3). The dust dilution ventilation system shall be suitably designed, manufactured, installed, tested and completed so that when in operation it reduces the levels of inhalable and respirable Agribulk dust to within acceptable levels in full compliance with the requirements of the Control of Substances Hazardous to Health (COSHH) Regulations 2002 The dust dilution ventilation system shall be suitably designed, manufactured, installed, tested and completed so that it reduces the levels of airborne Agribulk dust particles within each bay to a level which eliminates the risk of fire and/or explosion. The dust dilution ventilation system shall be suitably designed, manufactured, installed, tested and completed so that it is full compliance with the relevant ATEX directives and the Dangerous Substances and Explosive Atmospheres (DSEAR) Regulations 2002.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45331200 - Ventilation and air-conditioning installation work
39714110 - Extraction ventilators
45331210 - Ventilation installation work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors