Closed
Tunnel Ventilation System Maintenance.
Descriptions
Tunnel Ventilation System MaintenanceLarge Scale Maintenance in 2017 of 2 ventilation stations, 1 UK and 1 France.System Overview:ABB FLAKT design, with the following equipment at each station:— 2 Main fans, Flakt FPXC 200/100 (390kw, 86m3/s, axial flow, Hydraulically Controlled Variable Pitch Impeller).— 2 Auxiliary cooling fans.— 2 Central hydraulic units.— Associated control panels and instruments.Works:The 4 main ventilation fans will be removed from service for overhaul. 1 ventilator will be out of service at a time, each ventilator will be dismantled, and the impeller will be separated from the motor. The impeller and motor will then receive an overhaul and on completion the ventilator will be rebuilt, tested and re-commissioned.The ventilator must successfully complete a loaded test run before the next ventilator can be taken out of service. Due to our commercial service constraints the test run may be carried out during a night shift or over a weekend.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
Wales
CPV Codes
42522000 - Non-domestic fans
42521000 - Smoke-extraction equipment
Keywords
smoke extractor
smoke ventilation fan
fire safety exhaust
roof-mounted smoke vent
emergency smoke removal
smoke shaft fan
high-temperature fan
smoke evacuation unit
fire-rated ventilator
smoke purge system
industrial fan
commercial exhaust unit
HVAC fan
large axial fan
centrifugal ventilation fan
ceiling-mounted fan
warehouse blower
ducted air mover
high-capacity fan
motorized fan unit
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors