WP112.1 Permanent Walkways

Descriptions

The works are located at Northolt Tunnels West (NTW) Northolt Tunnels East (NTE) and Euston Tunnels (ET). At each location a twin-bore tunnel will be constructed, forming two parallel tunnels, each containing a single rail track. SCS JV will construct 13 miles of twin-bore tunnels on the HS2 route using six TBMs, of which five will operate simultaneously. Approximately 42km of escape and maintenance walkway must be constructed throughout the length of the running tunnels. The emergency walkway shall run on the cross passage side and connect to it as well as to safe areas at portals, intervention points and shafts to provide a safe walking route. The maintenance walkway shall be installed on the opposite side to facilitate access for the inspection, maintenance and periodic component replacement operations necessary for train operation. The preferred construction methods for the tunnel walkways shall be either horizontal slip-forming system (slip-forming paver) or a system using mechanised shutter-based slip formwork.

Timeline

Published Date :

17th Oct 2023 in a 1 year

Deadline :

30th Oct 2023 in a 1 year

Contract Start :

3rd Mar 2025

Contract End :

1st May 2028

Tender Regions

CPV Codes

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors