Awarded
YNE CDF Went Outfall Design and Build
Descriptions
This project has the primary objective of refurbishing the asset of Went Outfall through replacing the existing pair of timber tidal doors and hinges with new stainless-steel tidal doors and hinges, to sustain the standard of service (SOS), ensuring the doors can operate as designed, able to open and close to regulate water heights
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45246000 - River regulation and flood control works
Keywords
river regulation
flood control works
hydraulic river engineering
watercourse civil works
flood defence construction
channelization works
riverbank stabilization
flood mitigation infrastructure
water level control works
river training
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors