Open Closing in a 22 days
3" Cryogenic Vent Stack with Changeable Terminations
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined. The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange. 0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss with a 7/16" UNJF female fitting. The vent stack must have a maximum allowable working pressure of 40 barg. The vent stack should have a manual drain valve at the bottom of the stack which is spring loaded (normally closed). 1.5 m from the bottom of the vent stack should be a 3" ANSI flange connection and a 1½" ANSI flange connection. Both these flanges must be Class 300. The vent should come with 3 interchangeable termination designs which are on 3" ANSI Class 300 flanges to attach to the top of the vent stack. Suitable gaskets and torque values/calculations for all flanges should be provided. See In-tend for full requirements
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
fluid conduit
supply network
transport pipework
protective casing
industrial tubing
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :