Open

Anaerobic Digestion Project

Descriptions

The works in scope is the supply, installation, commissioning and acceptance testing of new source-separated food waste pre-treatment technologies, new reject handling technologies, and the reinstatement of existing technologies ("Anaerobic Digestion Project"). Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council. Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB). Until 2014, LRL had an AD process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the anaerobic digestion process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid. The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at: Lancashire Renewables Limited Farington Waste Recovery Park Sustainability Way Leyland PR26 6TB The works are inclusive of the supply, installation, commissioning, process integration and acceptance testing of the new source-separated food waste pre-treatment technologies, new reject handling technologies, and the reinstatement of existing technologies already present at the Client's waste recovery park located at PR26 6TB. The works must be complete, commissioned, and ready for handover no later than 30/06/2026. In carrying out the works, the Contractor will be required to undertake the following: • Procurement and supply of AD assets • Installation & integration • Commissioning • Acceptance testing The value of the works is below-threshold. LRL anticipates undertaking a restricted (invitation only) procurement procedure for the anaerobic digestion project. The tender would likely be issued in mid-June 2025. Ideally, LRL will award the contract no later than the beginning of September 2025. The works must be complete, commissioned, and ready for handover no later than 30/06/2026. Preliminary market engagement will help inform LRL of the capability and interest within the relevant supply market, i.e. contractors who have either reconfigured and upgraded existing AD plants or who have built AD plants in full and have the capability of undertaking LRL's project. The primary objectives of this preliminary market engagement are therefore: • To support LRL in determining which additional contractor to invite to the tender exercise. For transparency, LRL has already shortlisted one contractor (Marches Biogas Limited, company number 06855656) to invite to tender. Marches Biogas has undertaken a detailed design review for LRL concerning the new AD plant. Documents and design produced by this work will be used in the project's technical scope. Marches Biogas has had no involvement in the drafting of LRL's other tender documentation (contract excluding technical scope that may be included in the project, other tender documents including tender evaluation criteria and weightings). Marches Biogas will not be involved in the evaluation or discussion of any responses to this questionnaire or any bids received by other Contractors invited to tender. The decision regarding which additional contractor to invite to tender will be based on the quality of information provided by interested contractors in response to LRL's preliminary market engagement questionnaire, as well as the capability and capacity of the interested parties as established through this process. LRL will invite a maximum of two contractors to tender. • To gather any other information relevant to the delivery of LRL's tender project, such as technical details regarding LRL's project scope, following discussion with interested parties who return the preliminary market engagement questionnaire and undertake site visits per the next point. • To invite up to two questionnaire responders to visit LRL's site based at PR26 6TB to discuss the project. This includes viewing the new technologies sought by LRL as outlined in the process flow diagram, viewing LRL's current AD technology that will be remaining in situ, viewing the reception hall outlined in the diagram below, and generally a chance for the contractor to ask questions to aid their understanding of the project and confirm their interest in the tender. Please see the details further below regarding the engagement process.

Timeline

Published Date :

4th Apr 2025 3 days ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors