Open Closing in a 4 months
Barbican Estate Tower Lift Replacement
Descriptions
Barbican Estate Tower Lift Replacement is aiming to replace all lifts in Shakespeare, Cromwell, and Lauderdale Towers on the Barbican Estate. There are nine lifts in total, three serving each Tower. It is intended to procure a contractor that will deliver the project to the high standards required and ensure resident satisfaction.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45313100 - Lift installation work
42416100 - Lifts
Keywords
lifts
passenger lifts
elevator fitting
bath lift
hydraulic lifts
elevators
goods lifts
wheelchair lifts
service lift
lift installation
residential elevators
traction elevators
mechanical hoist fitting
passenger lift works
internal lift system
vertical transport system
freight elevator installation
shaft and lift cabin install
escalator and lift combination works
building lift system setup
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :